Laserfiche WebLink
<br />6.1A <br />Page 19 <br /> <br />1.06 CURRENT AND FUTURE CORRIDOR TRAFFIC <br /> <br />The following is a general summary of train traffic in the rail corridor: <br /> <br />A. Mainline - Current Owner Commuter Operations and UPRR freight traffic <br />1. Weekday train service, both directions <br />. Caltrain commute service per current timetable <br />. 4 to 6 UPRR freight trains between 9 PM to 4 AM <br /> <br />2. Saturday train service, both directions <br />. Caltrain commute service per current timetable <br />. 2 to 3 UPRR freight trains <br /> <br />3. Sunday train service, both directions <br />. Caltrain commute service per current timetable <br />. 2 to 3 UPRR freight trains <br /> <br />4. Special Event Service <br />. 3 to 4 trains each direction on days of San Francisco Giants Baseball home games <br />. 3 to 4 trains each direction on days of Stanford Football home games <br />. 3 to 4 trains each direction for other special events. <br /> <br />5. Other passenger rail carriers in accordance with their published timetables, including <br />but not limited to Amtrak Intercity, Altamont Commuter Express (ACE), and Capital <br />Corridor all of which operates in Santa Clara County_segment. <br /> <br />B. Mainline - Future Owner Commuter Operations and UPRR freight traffic <br /> <br />1. Owner's and other operator's commuter train traffic may vary in time and frequency <br />over the course of the contract per published revisions to timetables. <br /> <br />2. UPRR freight traffic is subject to change without notice at the discretion ofUPRR. <br /> <br />1.07 SAFETY <br /> <br />A. Employees of the Contractor scheduled or expected to perform work within Caltrain <br />Property are required to have successfully completed, within the last twelve (12) months, <br />Caltrain's Roadway Worker Protection training program. The Contractor shall forward <br />to Caltrain records of those successfully completing the course. <br /> <br />B. Roadway Worker Protection Act: Contractor shall at all times comply with provisions <br />of the Federal Rail Administration Regulation 49CFR214 (Roadway Worker Protection) <br />as well as to the Permittor (Licensor) On-Track Safety Program. <br /> <br />C. Zero Tolerance: The Caltrainl Amtrak Zero Tolerance Policy is attached and made a <br />part hereof. <br /> <br />D. The Contractor shall comply with the articles contained in the latest edition of the <br />following publications from the PCJPB or its Operating Railroad of Record (ORR), <br />currently Amtrak: <br />