My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 San Mateo Co, Peninsula Corridor Joint Powers Board (JPB) , San Mateo Co. Transit District (SamTrans) (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 San Mateo Co, Peninsula Corridor Joint Powers Board (JPB) , San Mateo Co. Transit District (SamTrans) (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 11:20:14 AM
Creation date
8/6/2010 3:49:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
San Mateo County
PROJECT NAME
License Agreement 800521
RMP File Number
304
Date
7/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G. Site Specific Work Plan (SSWP): A program,plan, and schedule prepared and submitted <br /> by the Contractor two weeks prior to the proposed work and approved by the Engineer that <br /> accurately describes and illustrates the manner in which Work within the Operating <br /> Envelope will be accomplished, the impacts on any elements of the Operating System and <br /> the manner in which Work will be accomplished with the allotted Work Windows or <br /> protected period. <br /> H. Engineer/Project Manager: Caltrain Engineer/Project Manager or other authorized <br /> representative. <br /> 1.03 WORK PLAN (WP) <br /> A. The Contractor will prepare a detailed Work Plan for each and every task associated with <br /> the work that is required by the Contract or any associated Field Instructions or Change <br /> Notices. <br /> B. WP's shall include all activities necessary to perform construction tasks within the PCJPB <br /> Right of Way, including use of stations, sidings, temporary construction easements and <br /> proposed storage areas. ' <br /> C. WP's shall include a description of any proposed changes to the Operating System <br /> between start and finish of the work, including any requested Work Windows. <br /> D. The WP shall conform to all other requirements applicable to the Contract Documents. ��I <br /> I <br /> E. The WP must contain a basic schedule of the work showing each activity and where and <br /> how it affects normal operation of the Operating System. Each activity in the plan shall <br /> include all labor,materials and equipment required to complete the activity within the <br /> PCJPB allotted time period. <br /> F. The WP must include Contingency Plans for putting the Operating System back in <br /> operation in case of an emergency or in case the Contractor fails to complete the work <br /> within the Work Window. The Contingency Plans shall address the various stages of <br /> activities to restore the System. <br /> � <br /> G. The WP s must be of sufficient detail, clarity and organization to permit efficient review <br /> by the Engineer and approval at least 10 calendar days before the proposed work is <br /> performed. The WP shall be submitted to the Engineer as follows. <br /> a) At least 21 calendar days prior to start of the subject work within the PCJPB Right of <br /> Way for work other than signal and overhead wire installation. <br /> b) At least 30 calendar days prior of the start of the work for work involving signal and <br /> overhead wire installation, such as signal system cutover, overhead wire involving <br /> third parties, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.