My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 San Mateo Co, Peninsula Corridor Joint Powers Board (JPB) , San Mateo Co. Transit District (SamTrans) (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 San Mateo Co, Peninsula Corridor Joint Powers Board (JPB) , San Mateo Co. Transit District (SamTrans) (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 11:20:14 AM
Creation date
8/6/2010 3:49:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
San Mateo County
PROJECT NAME
License Agreement 800521
RMP File Number
304
Date
7/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C�rl� • <br /> Peninsula Corridor Joint Powers Board(PCJPB),P.O.Box 3006(1250 San Carlos Ave.),San Carlos,CA 94070-1306, <br /> Engineering Department,(650)508-7968,FAX(650)508-7967 <br /> SITE SPECIFIC WORK PLAN (SSWP) APPLICATION <br /> SSWP APPLICATION JPB Project#: SSWP Submittal#: <br /> APPLICANT: <br /> ADDRESS: <br /> E-mail Address: <br /> TELEPHONE: FAX:: <br /> LOCATION of PROJECT <br /> PROJECT SITE CONTACT: <br /> DATE(S):REQUESTED: DAILY WORK HOURS REQUESTED: <br /> CLEARANCE TO NEAREST RAIL OF OPERATING TRACK: <br /> DESCRIPTION OF WORK TO BE PERFORMED: <br /> EQUIPMENT TO BE USED IN THE CONSTRUCTION: I <br /> EXCAVATION WITHIN THE RAILROAD ZONE OF INFLUENCE: YES NO <br /> IF SO APPROVED SHORING ATTACHED: YES NO <br /> SAFETY CONSIDERATIONS: <br /> All personnel working on project shall be JPB RWP Safety Trained per FRA Regulations <br /> NOTE: <br /> 1. RETURN COMPLETED FORM TO THE PCJPB,FAX(650)508-7967,BY 4:OOPM ON TUESDAY THREE <br /> WEEKS PRECEEDING WORK(EVERY WEEK,WEEKS BEGIN ON MONDAY)IN ORDER TO <br /> SCHEDULE INSPECTION AND/OR FLAGMEN. <br /> 2. WORK REQUIRING SHORING MUST INCLUDE ALL SHORING DRAWINGS STAMPED AND <br /> APPROVED BY A REGISTERED CIVIL ENGINEER AND BEAR THE APPROVAL OF THE JPB. <br /> 3. FAILURE TO COMPLETE THIS FORM ACCURATLEY MAY BE CAUSE FOR THIS PROJECT TO BE <br /> DELAYED OR SHUT DOWN. <br /> APPLICANT NAME(PLEASE PRINT) SIGNATURE <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.