My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt01 Kennedy/Jenks
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2001
>
Agmt01 Kennedy/Jenks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 8:50:29 PM
Creation date
4/4/2002 9:15:02 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Water recycling feasibility study
RMP File Number
304
Date
7/18/2001
Reso Ref
14239 14422
MO Ref
02-21 02-51 02-67
Task Order
Yes
Box
6593
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
existing filters at SBSA. Batch and continuous operational modes will be evaluated. Alternative <br />technologies, including membranes, will be evaluated for screening purposes. <br /> <br />Subtask 2.1.2 - Disinfection <br /> <br />Three screening alternatives for disinfection alternatives will be reviewed including: (1) construction of a <br />new hypochlorite addition and contact facility, (2) utilization of the existing SBSA hypochlorite addition <br />and contact facilities or (3) construction of a new UV disinfection facility. <br /> <br />Subtask 2.2.3 - Initial Treatment Alternative Screening Workshop <br /> <br />Following initial development of these screening alternative concepts, we will prepare Initial Alternative <br />Summaries that outline conceptual facility requirements, operations strategy, cost and non-cost factors. <br />Ten copies of the Initial Alternatives Summaries will be submitted for review prior to a facilitated half- <br />day workshop with City and SBSA staff, where the alternatives will be further discussed and up to three <br />final treatment alternatives selected for final evaluation. <br /> <br />Subtask 2.3 - Evaluate Feasibility and Cost of Treatment Alternatives <br /> <br />Following initial screening, Consultant will review the feasibility and costs of up to three final treatment <br />alternatives. Capital costs as well as O & M costs will be developed for each selected alternative. Cost <br />criteria, approved by the City, will be used to compare the alternatives on a life cycle basis. Non-cost <br />benefits or disadvantages of each alternative will also be presented. <br /> <br />Subtask 2.4 - Estimate Potential Future Recycled Water Production Capacity <br /> <br />Following an evaluation of the alternatives, the recycled water production potential at SBSA will be <br />estimated. The production potential may differ for the various treatment technologies and operations <br />alternatives. Some of the processes, both existing (filtration) and new (contact and UV disinfection), are <br />conveniently compartmentalized. Staged expansion concepts will be presented for treatment, storage and <br />pumping facilities. <br /> <br />Subtask 2.5 - Prepare Technical Memorandum No. 2: Treatment Evaluation <br /> <br />Work performed under this Task 2 will be summarized and presented in a draft and final Technical <br />Memorandum. Ten copies of TM No. 2 will be provided. Following receipt of City and SBSA written <br />comments to the draft memorandum, a meeting will be conducted with the City and SBSA staffto resolve <br />comments and finalize the TM. <br /> <br />Task 3 Distribution Evaluation <br /> <br />The distribution evaluation will use the following step-by-step approach. <br /> <br /> Review Existing System with Staff and Management <br /> <br /> Identify Initial Service Alternatives <br /> <br /> · Perform Pipeline and Facility gite Reconnaissance <br /> <br /> · Prepare Initial Alternative Summaries - Demands, Facility Requirements, Cost and Non-Cost <br /> Factors <br /> <br /> · Conduct Screening Workshop and Select Alternatives <br /> <br />u:~ayfiles~ active/h20 plaaning/kj_recycled\c0ntractsc0pe0fservicesdraft3a d0c 4 Redwood Shores <br /> Recycled Water Feasibility Study <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.