My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Ackerman Practicon Consolidated Technical Services
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Ackerman Practicon Consolidated Technical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2010 1:54:59 PM
Creation date
8/20/2010 1:54:58 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Ackerman Practicon Consolidated Technical Services
PROJECT NAME
Audio/Visual Room for Council Chamber Air Conditioning
RMP File Number
304.5
Date
8/18/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5. Based on the selected cooling concept we will provide the detailed design in <br />AutoCAD fOlmat suitable for bidding and construction. <br />6. Provide Title 24 calculation as needed for selected AC equipment. <br />7. Participate one kick-off meeting, one concept presentation nleeting, one meeting for <br />, final design, and one field trip for bidding. <br />8. Provide construction administration services by answering RFls, review shop drawing <br />submittals, and one field trip toward the end of consuuction. <br /> <br />We anticipate that the project design could be completed within four (4) upon authorization <br />to proceed. <br /> <br />We also assume that the City will provide us, within reasonable time, the as-build drawings <br />of this area and the measured electrical load data for existing AudioNisual equipment in <br />operation. <br /> <br />Comnensation <br /> <br />The proposed fixed price compensation for different packages is presented as follows: <br /> <br />Review Exist. Drawings/Equipment Info <br />Heat Load verification <br />Cooling load Calculation <br />Complete Bid Documents ~ Engineering <br />Design <br />Title 24 Calculations <br />Attend up to 3 Design Meetings and 1 Field Survey <br />Construction Administration Services <br />Subtotal <br />Estimated Reimbursable <br />Proj ect Total <br /> <br />8Hrs@$145/Hr= $ 1,160.00 <br />4Hrs@$145/Hr== $ 580.00 <br />4Hrs@$145/Hr == $ 580.00 <br />12Hrs@$145/Hr== $ 1,740.00 <br />12Hrs@$120/Hr== $ 1,440.00' <br />4Hrs@$145/Hr==$ 580.00 <br />8Hrs@$1451Hr=$ 1,160.00 <br />8Hrs@$145/Ih' == $ 1.160.00 <br />60Hi'S $ 8,400.00 <br />$ 500.00 <br />$ 8,900.00 <br /> <br />In addition, we have attached the current rate schedule for your review. If there are any <br />questions, please contact me or Mr. Kung at 650~965-1000. <br /> <br />VelY tluly yours, <br /> <br />Charles H Lee, PE <br />Principal <br /> <br />Attachments: Rate Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.