My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res69 6022
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1960-1969 partial
>
1969
>
Res69 6022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2010 8:21:19 AM
Creation date
8/30/2010 8:21:18 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
6/23/1969
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />(2) That the location and design of above ground fixtures <br />within public rights of way and other public utility <br />easements shall be subject to approval of the Redwood <br />Shores Urban Design Committee. <br /> <br />(3) That roof construction on buildings constructed within <br />the area subject to planned development permit PD69-02 <br />shall be wood shake or shingle roofing applied to <br />conform to the requirements and specifications of a <br />cedar asbestos roof system, and the application thereof <br />shall be inspected and verified in writing to the <br />Building and Fire Departments of the City of Redwood <br />City by the Red Cedar Shingle and Hand Split Shake <br />Bureau. <br /> <br />(4~ That an Architectural Permit be obtained from the <br />Architectural Committee pursuant to Section 45.2(a), <br />of the Zoning Ordinance. <br /> <br />* <br /> <br />* <br /> <br />*- <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.