<br />Attachment 2 East 101 Public Infrastructure Requirements
<br />City of Redwood City
<br />
<br />
<br />EDU
<br />
<br />Transportation (Bridge)
<br />(ped underpass)
<br />(road from bridge to maple east)
<br />
<br /> Totals 2635
<br /> EDU
<br /> Bsyside G8R1ens
<br />A-W1 Water (zone dist system)
<br />S-SS1 Sewer (collecticn sys)
<br />AB-5SPS Sewer (pump station) - Shared with B
<br />A-SDPS Stonn urn station
<br /> Zone Pro' ct Subtotal 604
<br /> All Zone Project Subtotal
<br /> Zone Project + All Zone Project Total
<br /> Bay.ide Gardens Contribution 604
<br /> EOU
<br /> Pete's HIJItJor, Penn PaJ1c
<br />B-W1 Water (zone dist system)
<br />B-W2 Water (zone diat system)
<br />B-RW1 Recycled water
<br />B-SS1, 2 & 3 Sewer (collection sys)
<br />AB-SSPS sewer u station - Shared with A
<br /> Zone Pro d Subtotal 1401
<br /> All Zone Project Subtotal
<br /> Zone Project + All Zone Project Total
<br /> Penn Park Contribution 1001
<br /> Pete's Harbor Contribution 400
<br />
<br />
<br />
<br />
<br />
<br />C.SS1
<br />
<br />
<br />EDU
<br />
<br />
<br />, . ll' .;: ...
<br />Abbott Labs, lnsdusttrilll, Paemc Shores
<br />Water (area dist system) . TBD
<br />Sewer (collection sys) - TBD
<br />Road + Storm - TBD
<br />Zone Pro' d Subtotal
<br />All Zone Project Subtotal
<br />Zone Project + AI Zone Project Total
<br />Abbott Labs Site Contribution
<br />Industrial Area Contribution
<br />Pacific Shores Area Contribution
<br />
<br />EDU
<br />
<br />420
<br />
<br />270
<br />o
<br />150
<br />
<br />Cost
<br />$4,800.000.00
<br />$2,000.000.00
<br />$1.000.000.00
<br />$280,000.00
<br />$1,859.200,00
<br />$10,447,320.00
<br />$336,000.00
<br />$1,142,400.00 $
<br />$1 091 626.67
<br />$22 958 548,67
<br />
<br />C' Contribution CostlEDU
<br />$5,000.000.00
<br />
<br />455,000.00
<br />
<br />
<br />Cost
<br />
<br />CostlEDU
<br />
<br />$571,200.00
<br />$357,000.00
<br />$295,273.17
<br />5980.000.00
<br />$2203473.17
<br />$5,263.153.02
<br />$7,466,626.18
<br />$7,466,626.19
<br />
<br />
<br />Cost
<br />
<br />CostlEDU
<br />
<br />$1,030.400.00
<br />$336.000.00
<br />$394,800.00
<br />$660,400.00
<br />$684,726.83
<br />$3126326.83
<br />$12,205,044.07
<br />$15,331,370.90
<br />$10,954,105.83
<br />$4.377 ,265.07
<br />
<br />
<br />Cost
<br />
<br />CostlEDU
<br />
<br />210
<br />
<br />5378 000.00
<br />$378 000.00
<br />$1,829,449.86
<br />$2,207,449.88
<br />$2.207.449.66
<br />
<br />
<br />210
<br />
<br />Cost
<br />
<br />CostlEOU
<br />
<br />
<br />$0.00
<br />$3.658.899.72
<br />$3,658,899,72
<br />$2,352,149,82
<br />$0.00 tmpact assessment will be case by c
<br />$1,306,749.90 basis via CEQA and Use Permit.
<br />
<br />This Table shows foreseeable projects for individual Zone and the Region. Additional projects may be added.
<br />Each development is responsible for constnJctjon of their own site utilities improvement projects in addition to their monetary
<br />contribution and lor bui/ding of spec/(;c zone and region projects.
<br />Project costs and EDU esnmates lire subject fo annual review and revision
<br />EDU :I: 2000 SF Commercial Floor Ares or one housing uit.
<br />
<br />rev 12/1112007