Laserfiche WebLink
<br />Attachment 2 East 101 Public Infrastructure Requirements <br />City of Redwood City <br /> <br /> <br />EDU <br /> <br />Transportation (Bridge) <br />(ped underpass) <br />(road from bridge to maple east) <br /> <br /> Totals 2635 <br /> EDU <br /> Bsyside G8R1ens <br />A-W1 Water (zone dist system) <br />S-SS1 Sewer (collecticn sys) <br />AB-5SPS Sewer (pump station) - Shared with B <br />A-SDPS Stonn urn station <br /> Zone Pro' ct Subtotal 604 <br /> All Zone Project Subtotal <br /> Zone Project + All Zone Project Total <br /> Bay.ide Gardens Contribution 604 <br /> EOU <br /> Pete's HIJItJor, Penn PaJ1c <br />B-W1 Water (zone dist system) <br />B-W2 Water (zone diat system) <br />B-RW1 Recycled water <br />B-SS1, 2 & 3 Sewer (collection sys) <br />AB-SSPS sewer u station - Shared with A <br /> Zone Pro d Subtotal 1401 <br /> All Zone Project Subtotal <br /> Zone Project + All Zone Project Total <br /> Penn Park Contribution 1001 <br /> Pete's Harbor Contribution 400 <br /> <br /> <br /> <br /> <br /> <br />C.SS1 <br /> <br /> <br />EDU <br /> <br /> <br />, . ll' .;: ... <br />Abbott Labs, lnsdusttrilll, Paemc Shores <br />Water (area dist system) . TBD <br />Sewer (collection sys) - TBD <br />Road + Storm - TBD <br />Zone Pro' d Subtotal <br />All Zone Project Subtotal <br />Zone Project + AI Zone Project Total <br />Abbott Labs Site Contribution <br />Industrial Area Contribution <br />Pacific Shores Area Contribution <br /> <br />EDU <br /> <br />420 <br /> <br />270 <br />o <br />150 <br /> <br />Cost <br />$4,800.000.00 <br />$2,000.000.00 <br />$1.000.000.00 <br />$280,000.00 <br />$1,859.200,00 <br />$10,447,320.00 <br />$336,000.00 <br />$1,142,400.00 $ <br />$1 091 626.67 <br />$22 958 548,67 <br /> <br />C' Contribution CostlEDU <br />$5,000.000.00 <br /> <br />455,000.00 <br /> <br /> <br />Cost <br /> <br />CostlEDU <br /> <br />$571,200.00 <br />$357,000.00 <br />$295,273.17 <br />5980.000.00 <br />$2203473.17 <br />$5,263.153.02 <br />$7,466,626.18 <br />$7,466,626.19 <br /> <br /> <br />Cost <br /> <br />CostlEDU <br /> <br />$1,030.400.00 <br />$336.000.00 <br />$394,800.00 <br />$660,400.00 <br />$684,726.83 <br />$3126326.83 <br />$12,205,044.07 <br />$15,331,370.90 <br />$10,954,105.83 <br />$4.377 ,265.07 <br /> <br /> <br />Cost <br /> <br />CostlEDU <br /> <br />210 <br /> <br />5378 000.00 <br />$378 000.00 <br />$1,829,449.86 <br />$2,207,449.88 <br />$2.207.449.66 <br /> <br /> <br />210 <br /> <br />Cost <br /> <br />CostlEOU <br /> <br /> <br />$0.00 <br />$3.658.899.72 <br />$3,658,899,72 <br />$2,352,149,82 <br />$0.00 tmpact assessment will be case by c <br />$1,306,749.90 basis via CEQA and Use Permit. <br /> <br />This Table shows foreseeable projects for individual Zone and the Region. Additional projects may be added. <br />Each development is responsible for constnJctjon of their own site utilities improvement projects in addition to their monetary <br />contribution and lor bui/ding of spec/(;c zone and region projects. <br />Project costs and EDU esnmates lire subject fo annual review and revision <br />EDU :I: 2000 SF Commercial Floor Ares or one housing uit. <br /> <br />rev 12/1112007 <br /> <br />