My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecD08 2008-086768 (2)
RedwoodCity
>
City Clerk
>
Recorded Docs 2000-2009
>
2008
>
RecD08 2008-086768 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2016 10:30:40 AM
Creation date
9/3/2010 1:03:53 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
R.C. Peninsula Park, LLC
Doc Num
2008-086768. 039357
Rec Date
7/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1- <br /> <br />.. <br /> <br />Attachment 3 <br /> <br />PHASING SCHEDULE FOR ZONE B, ZONE AB, AND ALL ZONES IMPROVEMENTS <br /> <br />This Attachment lists Project milestones by which time the East 101 Public Infrastructure Improvements <br />shaH be completed. Refer to Attachment 1 for a map depicting the location of such improvements. The <br />East 101 Public Infrastructure Improvements shown on Attachment 1 but not on this Phasing Schedule <br />are not required for the Project, but rather are required for the redevelopment of other properties. <br /> <br />The milestones set forth in this Attachment are intended as a mandatory date by which City will require <br />such improvements to be completed, With consent of City and Developer, any of these improvements <br />may be completed sooner or may be combined with other East 101 Public Infrastructure Improvements <br />for the purposes of efficiency and cost savings. <br /> <br />Improvement Description Milestone event by which improvement is <br />Designation to be completed <br />R-WIOl Potable Water Line Under Prior to the issuance of the Certificate of <br /> Highway 101 and west of Occupancy for the hotel Or the first Phase of <br /> Highway 101 residential development in the Project. <br />B-SS2 Sanitary Sewer Line Same as R-WIOl. <br />B-SS3 Sanitary Sewer Line Same as R-WIOl. <br />B-WI Potable Water Line Same as R-WIOI. <br />B-W2 Potable W ster Line east of Same as R-WIOI. <br /> Highway 101 <br />B-RWl Recycled Water Line Same as R-WIOl. <br />AB-SSPS Sanitary Sewer Pump Station Same as R-WIOl. <br />R-Underpass Pedestrian Underpass Under Hwy Prior to the Final Map approval, that includes the <br /> 101 500. residence in the Project. <br />R-Bridge Blomquist Bridge Same as R-Underpass. <br />R-New Road New Road from Bridge east to Same as R-Underpass. <br /> Maple <br />R-RWiden 1 East Bayshore Road Widening Same as R-Underpass. <br />R-RWiden2 Blomquist Same as R -Underpass. <br /> ReconstructionIW ideninJ! <br /> <br />ATTY/AGR/2008.013 EXHlBITD <br />022708 <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.