My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Town of Woodside
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Town of Woodside
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2010 1:02:10 PM
Creation date
9/22/2010 12:44:20 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Cost sharing agreement for the slurry sealing of portions of Fernside St and Alameda de las Pulgas in conjunction with the city's 2009-2010 spot repair and slurry seal project
RMP File Number
304
Date
9/21/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t.. <br /> <br />NOW, THEREFORE, IT IS AGREED AS FOLLOWS: <br /> <br />1. The Town grants the necessary permission to the City to do work within the <br /> <br />Town limits as herein described and shown on Exhibit "A." <br /> <br />2. The City will include in its contract for the above-described project, spot repair <br /> <br />and slurry seal, work of portions of Fernside Street and Alameda De Las Pulgas within the limits <br /> <br />of the Town. <br /> <br />3. The City will award a contract to the lowest responsible bidder pursuant to the <br /> <br />competitive bid processes as set forth in Chapter 2, Section VII of the Redwood City Code. The <br /> <br />City agrees to notify the Town of the successful bidder to whom the construction contract is <br /> <br />awarded. <br /> <br />4. The City will award a contract for the complete spot repair and slurry seal project, <br /> <br />which shall include the work described above for the Town portion of the roadway spot repair <br /> <br />and slurry seal work. The work to be performed shall be completed pursuant to and in accord <br /> <br />with standard City specifications. <br /> <br />5. The construction contract shall require the contractor to obtain and maintain <br /> <br />insurance and surety bonds as set forth in the City's standard public works contract Document <br /> <br />700 General Conditions, Part II. The contractor shall be required to comply with all applicable <br /> <br />laws as set forth in the City's standard public works contract Document 700 General Conditions, <br /> <br />Part VI. The contractor shall be required to name the City and the Town as additional insureds. <br /> <br />6. Pursuant to paragraph 11, the Town agrees to reimburse City the total cost <br /> <br />incurred by the City for work on Town facilities, including any contract Change Orders and <br /> <br />project management costs , provided that said project management costs which shall be ten <br /> <br />percent (10%) of the construction contract and Change Order costs for work performed on Town <br /> <br />facilities. <br /> <br />7. The estimated maximum fiscal obligation for work performed on Town facilities is <br /> <br />$27,500.00. Any contract change orders on the Town's portion of the construction work will be <br /> <br />A TTY lAG R/20 1 0.074 <br />091310 <br /> <br />2 <br /> <br />L__ <br />
The URL can be used to link to this page
Your browser does not support the video tag.