<br /> REPORT
<br /> To the Honorable Mayor and City Council
<br /> From the Cit Mana er
<br /> September 27, 2410
<br /> SUBJECT
<br /> Award of Contract—2010-2�11 Watermain Replacement Project
<br /> RECOMMENDATION
<br /> Approve, by motion, the contract documents and award the standard form contract for
<br /> the 2010-2011 Watermain Replacement Project to Casey Construction, Inc. of
<br /> Redwood City, for their responsive and responsible low bid of $1,�49,549.00 and
<br /> authorize the City Manager to increase the contract amount, if necessary, up to 1�°/a of
<br /> the amount awarded.
<br /> BACKGROUND
<br /> The city systematically replaces sections of aging watermain infrastructure to ensure the
<br /> continued reliability of the system and to provide for improved fire protection. Annually,
<br /> staff from Building, Infrastructure and Transportation and Public V1lorks Services
<br /> departments identify pipeline sections that have had service disruptions, excessi�e
<br /> maintenance requirements, or capacity limitations due to age and target those sections
<br /> for replacement. This year, the 2010-2011 Watermain Replacement Project will replace
<br /> approximately 5,819 feet of deteriorated cast iron water pipeline (distribution and
<br /> transmission systems) with more durable PVC pipe. On Valota Street, 8-inch cast iron
<br /> will be replaced with 12-inch PVC to serve as an arterial main. Substandard 2-inch
<br /> galvanized pipe wilf be upgraded to 8-inch PVC watermain on Ruby, Sapphire, and Taft.
<br /> Lateral service connections (131) and eight existing fire hydrants will be replaced. As
<br /> well, eight additional fire hydrants will be installed to enhance fire protection capabilities.
<br /> Please see attached project location map.
<br /> The nine (9) bids received at the bid opening on September 1, 2010, are summarized in
<br /> the table below.
<br /> Bidder Bid Amount
<br /> Case Construction, Inc. — Redwood Cit $1,049,549.0�
<br /> Fermin Sierra Construction, Inc. — Union Cit 1,063,000.00
<br /> W.R. Forde Associates—Richmond 1,067,867.00
<br /> West Valle Construction Com an , Inc. —San Jose 1,102,2�6.00
<br /> Pacific Under round Construction, Inc. —San Jose 1,102,820.0�
<br /> Shaw Pi eline —San Francisco 1,114,085.00
<br /> J & M, Inc. --Livermore 1,298,405.00
<br /> Con-Quest Contra�tors, lnc. —San Francisco 1,340,006.00
<br /> Lewis &Tibbits, Inc.—San Jose 1,517,552.00
<br /> En ineer's Estimate $1,145,705.00
<br /> Recommended Bidder: Casey Construction, Inc.
<br /> Substantiation: Casey Construction, lnc. is the fowest responsive and responsible bidder.