My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-10-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 1:07:15 PM
Creation date
10/7/2010 3:42:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A <br /> Attach-Rap 36 <br /> Impact 4.5-4: Ground-disturbing activities associated with construction <br /> of new development allowed under the New General Nan could impact previously <br /> undiscovered human remains. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on page 4.5-25 of the DEIR. <br /> b) Mitigation Measures. The following mitigation measures are hereby <br /> adopted and will be implemented as provided in the Mitigation Monitoring and Reporting <br /> Program: <br /> FEIR Mitigation Measure 4.5-3a(p. 4.5-26 of the DEIR). <br /> FEIR Mitigation Measure 4.5-3b (p. 4.5-26 of the DEIR). <br /> c) Findings. Based on the FEIR and the entire record before the City, <br /> the City Council finds that Mitigation Measures 4.5-3a and 4.5-3b would reduce the <br /> impacts relating to undiscovered human remains to a less-than-significant level because <br /> they would require (i) that construction crews be trained regarding the possible presence <br /> of archaeological and human remains and the laws and procedures for protecting such <br /> remains, (ii) work stoppage if such remains are discovered, (iii) consultation with the San <br /> Mateo County Coroner and a qualified archaeologist concerning appropriate treatment of <br /> such remains, and (iv)the implementation of appropriate measures based on consultation <br /> with the Coroner and archaeologist. <br /> 4.6 Geology and Soils <br /> Impact 4.6-1: The plan area is subject to a number of potential seismic <br /> hazards, including ground shaking, landslides, liquefaction, and lateral spreading <br /> that would affect future development allowed under the New General Plan. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 4.6-15 to 4.6-16 of the DEIR. <br /> b) Mitigation Measures. FEIR Mitigation Measure 4.6-1 (p. 4.6-16 <br /> of the DEIR) is hereby adopted and will be implemented as provided in the Mitigation <br /> Monitoring and Reporting Program. <br /> c) Findings. Based on the FEIR and the entire record before the City, <br /> the City Council finds that Mitigation Measure 4.6-1 would reduce impacts from <br /> seismic activities to a less-than-significant level because where seismic hazards cannot <br /> be mitigated through existing regulatory requirements and new policies in the proposed <br /> New General Plan, the City will use open-space easements and other land use regulatory <br /> restrictions to limit development on such sites and thereby avoid public safety hazards. <br /> ATTY/RESO/RESO.2055/ATTACHMENT1.A 22 <br /> 10/6110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.