My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-10-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 1:07:15 PM
Creation date
10/7/2010 3:42:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A <br /> Attachrrgag.R 35 <br /> 0 4.5 Cultural Resources <br /> Impact 4.5-2: Construction activities, including site preparation and <br /> grading, associated with new development allowed under the New General Plan <br /> could adversely impact previously undiscovered archaeological resources due to <br /> uncovering or unearthing these resources. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on page 4.5-23 of the DEIR. <br /> b) Mitigation Measures. The following mitigation measures are hereby <br /> adopted and will be implemented as provided in the Mitigation Monitoring and Reporting <br /> Program: <br /> FEIR Mitigation Measure 4.5-1 a(p.4.5-23 to 4.5-24 of the DEIR). <br /> FEIR Mitigation Measure 4.5-1 b(p. 4.5-24 to 4.5-25 of the DEIR). <br /> c) Findings. Based on the FEIR and the entire record before the City, <br /> the City Council finds that Mitigation Measures 4.5-la and 4.5-lb would reduce the <br /> impacts to archaeological resources to a less than significant level because the mitigation <br /> measures require that (i) construction crews be trained regarding the possible presence <br /> and identification of cultural resources and regarding laws and procedures for protecting <br /> cultural resources, (ii) work that work be stopped if cultural resources are discovered on <br /> IIIthe construction site, (iii) a qualified archaeologist be retained to evaluate the significance <br /> of discovered resources, and (iv) appropriate steps be taken to avoid, protect and preserve <br /> such resources as described in Mitigation Measure 4.5-1(a) on page 4.5-24 of the DEIR. <br /> Impact 4.5-3: Earth moving activities, particularly deep grading, associated <br /> with the construction of new development allowed under the New General Plan has <br /> the potential to destroy paleontological resources. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on page 4.5-25 of the DEIR. <br /> b) Mitigation Measures. FEIR Mitigation Measure 4.5-2 (p. 4.5-25 <br /> of the DEIR) is hereby adopted and will be implemented as provided in the Mitigation <br /> Monitoring and Reporting Program. <br /> c) Findings. Based on the FEIR and the entire record before the <br /> City,the City Council finds that Mitigation Measure 4.5-2 would reduce the impacts <br /> to paleontological resources to a less-than-significant level because the measure requires <br /> (i)prior to the issuance of grading or demolition permits, an assessment or study by a <br /> qualified paleontologist of the project's potential to destroy unique paleontological <br /> resources, (ii) if appropriate, recommendations from the qualified paleontologist for <br /> protecting unique resources, and (iii) work stoppage if any sensitive paleontological <br /> resources are discovered to permit the implementation of steps to protect such resources. <br /> II <br /> ATTY/RESO/RESO.2055/ATTACHM ENT1.A <br /> 21 <br /> 1 0/6/1 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.