My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-10-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 1:07:15 PM
Creation date
10/7/2010 3:42:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A <br /> Page 71 <br /> • Chair Radcliffe thanked Staff and the consultants for their work towards the New <br /> General Plan. She was excited about the mixed use waterfront discussions. She was <br /> pleased with the streetcar design. <br /> Mr. Aranda, prior to the Motions, noted that Actions 1 and 2 were encapsulated in one <br /> resolution, so the Commission could make one Motion for both. <br /> M/S (Borgens/Smith) recommendation by the Planning Commission to the City Council 1 <br /> to Adopt a Resolution to certify the Final Environmental Impact Report (Final EIR) <br /> prepared for the New General Plan, subject to implementation of the EIR mitigation <br /> measures; and adopt the Mitigation Monitoring and Reporting Program (MMRP) <br /> prepared for the project, based on the findings outlined below: <br /> a) The Final EIR has been completed in compliance with the California <br /> Environmental Quality Act(CEQA); <br /> b) The Final EIR has been presented to the Planning Commission and the <br /> Planning Commission has reviewed and considered the information <br /> contained in the Final EIR before recommending approval of the project to <br /> the City Council; <br /> c) The Final EIR reflects the City's independent judgment and analysis; (See <br /> Attachment 1 —Resolution certifying Final EIR <br /> Adopt a Resolution to approve the New General Plan including: the text and land use <br /> map dated November, 2009; Section 3.0 Revisions and Errata of the Draft EIR <br /> described in the document A New General Plan for Redwood City Response to <br /> comment on the draft EIR and Mitigation Monitoring Reporting Program dated <br /> III August2010 ; the General Plan Revision Matrix with attachments; and other changes <br /> as deemed appropriate. (See Attachment 2-Resolution to adopt New General Plan <br /> including text and land use map) <br /> Motion Passed 6-0 (Holt Absent) <br /> 6. MATTERS OF COMMISSION INTEREST <br /> • The Downtown Precise Plan documents and the Draft EIR for the <br /> Downtown Precise Plan were pending. September 21st was noted <br /> as a possible date for a public hearing on the Draft Downtown <br /> Precise Plan. <br /> • The General Plan will return to City Council in October with the <br /> Commission's recommendations. <br /> 7, M/S (Borgens/Schmidt)to adjourn at PM <br /> III <br /> Page 12 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.