My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-10-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 1:07:15 PM
Creation date
10/7/2010 3:42:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Aitt@ggrinnt 6b <br /> PUBLIC WORKS SERVICES DEPARTMENT <br /> MEMORANDUM <br /> Date: September 24 2010 <br /> To: Jill Ekas, Planning, Housing & Economic Development Director <br /> From: Justin Ezell, Public Works Superintendent <br /> Subject: Water Demand Projects in the New General Plan <br /> Redwood City receives 100% of its potable drinking water from the San Francisco Public <br /> Utilities Commission (SFPUC). The SFPUC has a contractual obligation to provide 12,243 <br /> acre-feet per year of potable water to the City. Potable water demand projections in the <br /> New General Plan(NGP) are anticipated to exceed SFPUC supply by an estimated 1,585 <br /> acre-feet per year by 2030; this amount is13% greater than SFPUC's contractual <br /> obligation. These assumptions are somewhat higher than those made in the City's 2005 <br /> Urban Water Management Plan (UWMP). The 2005. UWMP projections are based on the <br /> City's 1990 General Plan, exclusive of newly identified changes in land use patterns and <br /> designations. <br /> Water demand projections for growth under the NGP have been prepared using the same <br /> methodologies used in the 2005 UWMP (i.e. demand by customer type, including <br /> assumptions for water conservation and recycling). These new projections are inclusive of <br /> the newly identified changes in land use patterns and designations that are assumed under <br /> the NGP (i.e. growth expected within the City's water service area, to include the City limits <br /> and some portions of the Sphere of Influence). Also of note is that the growth projections <br /> prepared by the land use planners for the NGP were established to allow for a conservative <br /> analysis of the impacts of the NGP. Thus, the projections assumed significant reuse of <br /> already developed properties (up to 30% of the land area in the higher density and intensity <br /> land use designations). The potential for this much change over the plan's twenty year <br /> horizon is very unlikely, however, making these high growth assumptions was considered <br /> prudent in that it resulted in a conservative evaluation of the impacts of the plan, including <br /> elevated water demand projections. <br /> The City's 2010-2011 UWMP (currently under development) will further refine demand <br /> projection methodologies above and beyond those used for the NGP; they will encompass <br /> new regulations such as Senate Bill x 7 7 which requires the State of California as a <br /> whole to achieve a 20% reduction in per capita water use by 2020. Therefore, projected <br /> water demands as expressed in the NGP are expected to be higher and more conservative <br /> than demands as will be expressed in the 2010-2011 UWMP. <br /> Despite the conservative nature of the NGP projections, staff continues to develop <br /> strategies which account for potential shortfalls in water supply. Among these, is the Long- <br /> term Reliable Water Supply Strategy (LTRWSS) that Redwood City is working on in <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.