My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-10-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 1:07:15 PM
Creation date
10/7/2010 3:42:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A <br /> Page 91 <br /> between Hudson Street and Clinton Street if traffic signals on El Camino Real can be <br /> appropriately timed to accommodate it. <br /> • Broadway between Maple Street and a quarter-mile east of Douglas Avenue—where <br /> Broadway already provides a three lane cross-section (from 4 lanes to 3 lanes) <br /> • Brewster Avenue between El Camino Real and Elwood Street(from 4 lanes to 3 <br /> lanes) <br /> • Farm Hill Boulevard (from 4 lanes to 3 or 2 lanes) <br /> Section 4.1 5 - Utilities is added. The following text is added: <br /> Page 4.15-25,third paragraph (continued from heading"New General Plan <br /> Policies and Programs"on page 4.15-24)has been revised as follows: <br /> Program NR-12 requires the City to maintain its BAWSCA membership and to consult <br /> with BAWSCA to explore the potential for water transfers of recycled water for potable <br /> water. Implementation of this program may result in additional supplements to the <br /> City's potable water supply. <br /> Program BE-22 requires the City to track new residential units and non- <br /> residential square footage and limit new development based on available <br /> water resources.Mitigation Measure 4.11.1 modifies Program BE-22 to limit <br /> development based on available water resources,taking into account <br /> demands of existing and planned uses, including agricultural and industrial <br /> uses. <br /> Page 4.15-25,first paragraph under the heading"Conclusion Regarding Water <br /> Supply Sufficiency for New General Plan"has been revised as follows: <br /> The proposed New General Plan policies and programs described above,partnered with <br /> the future responsibility of the City to re-evaluate its water demand projections on an <br /> ongoing basis and to conduct environmental review and water supply <br /> evaluations for future development under the New General Plan pursuant to <br /> CEQA, SB 610 (Water Code sections 1O91o, et seq.) and SB 221(Government <br /> Code section 66473.7),would ensure that the City has adequate water supplies to <br /> serve its anticipated demands and does not approve developments for which water <br /> supply is not available. However,none of the above factors, er policies or programs <br /> would guarantee that the City's future water supplies would be sufficient to <br /> fully serve the level of development the City projected under the New General Plan <br /> could be fully served by the City's anticipated Supply Assurance from the SFPUC.-f <br /> development occurs as projected,the City's water demands could outpace available <br /> supplies by 2010.This would Therefore,the City considers the uncertainty <br /> associated with relying on its existing and anticipated future water supplies <br /> to meet the demands of existing and projected development under the New <br /> General Plan to be a significant unavoidable environmental impact under criteria(d). <br /> Beyond the above factors,programs,and policies that address the impact,no other <br /> mitigation is feasible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.