Laserfiche WebLink
6.1D <br /> Page 1 <br /> REPORT <br /> To the Honorable Mayor and City Council <br /> From the City Manager <br /> October 11, 2010 <br /> SUBJECT <br /> Award of Contract— Fair Oaks Child Care Center Infant Play Area Renovation Project <br /> RECOMMENDATION <br /> Approve, by motion, the contract documents and award the standard form contract for <br /> the Fair Oaks Child Care Center Infant Play Area Renovation Project to Blossom Valley <br /> Construction of San Jose for their responsive and responsible low base bid of <br /> $144,187.00 and include additional bid items of $28,956.00 for a total contract amount <br /> of $173,143.00. And, authorize the City Manager to increase the contract amount, if <br /> necessary, up to 10% of the amount awarded. <br /> BACKGROUND <br /> There are two child care play areas at Fair Oaks Community Center that serve up to 86 <br /> children, ages 1 through 5. These two separate play areas are distinct and have their <br /> own play equipment and surfaces. The infant care play area is for the exclusive use of <br /> up to 20 toddlers ages 1 through 3, while the other area is for preschoolers, ages 4 <br /> through 5. <br /> The infant care play area is over 18 years old and does not function effectively. There is <br /> a large concrete enclosed sand play area that is outdated which does not allow toddlers <br /> to move about freely during play. The existing playground equipment has outlived its <br /> useful life; and after multiple repairs over the years, replacement parts are no longer <br /> available to attempt another restoration of the worn structures. <br /> Abey Arnold Associates, Landscape Architects, was retained in September, 2009 to <br /> assist staff with community outreach, to provide design documents and construction <br /> support for the renovation of the play area. Several meetings were held with the child <br /> care facilitators to generate design ideas and ensure the new infant play area met the <br /> needs of the users and the center. The design concept that resulted from this process <br /> features sufficient space for children to safely ride tricycles, removal of the concrete <br /> enclosed sand area to open up the area to allow toddlers more freedom of movement, <br /> and installation of new play structures designed as tool sheds, theater panels, and <br /> snack shacks. A large covered area where the children can play outside during <br /> inclement weather and concrete seat wall are included as additive items and staff <br /> recommends awarding these as well. <br /> As the lead agency, City of Redwood City has determined that the Fair Oaks Child Care <br /> Center Infant Play Area Renovation Project meets the CEQA exemption criteria as set <br /> forth in Section 15302, ("Replacement or Reconstruction"). Furthermore, this project has <br /> been designed compliant with the city's Engineering Standards and accepted landscape <br /> architectural practices. <br /> The six (6) bids received at the bid opening on September 29, 2010, are summarized in <br /> the table below. <br />