My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-10-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 1:07:15 PM
Creation date
10/7/2010 3:42:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1D <br /> Page 2 <br /> Bidder Base Bid Additive Bid Total Bid <br /> Blossom Valley Construction, Inc.--San Jose $144,187.00 $28,956.00 $173,143.00 <br /> McNabb Construction, Inc. --Lafayette 158,638.20 19,180.00 177,818.20 <br /> Silicon Valley Builders--San Jose 185,601.00 27,800.00 213,401.00 <br /> Ranis Construction& Electric Inc.—San 198,800.00 19,300.00 218,100.00 <br /> Francisco <br /> Rodan Builders, Inc.—Burlingame 214,073.00 38,000.00 252,073.00 <br /> Gold Spring Construction--San Francisco 232,452.00 26,108.00 249,560.00 <br /> Engineer's Estimate $140,000.00 $231000.00 $163,000.00 <br /> Recommended Bidder: Blossom Valley <br /> Construction, Inc. <br /> Substantiation: Blossom Valley <br /> Construction, Inc. is the lowest responsive <br /> and responsible bidder. <br /> The total low bid of $173,143.00 is 6.2% higher than the engineer's estimate of <br /> $163,000.00. This project is sufficiently funded to accommodate the overage and the <br /> cost of the additional bid items. Blossom Valley Construction, Inc. has successfully <br /> completed similar projects in the past and is a qualified contractor. Based on the bids <br /> received, staff believes that the low bid is reasonable and recommends awarding the <br /> contract to Blossom Valley Construction, Inc. <br /> ALTERNATIVES <br /> Council may choose not award the contract for the Fair Oaks Child Care Center Infant <br /> Play Area Renovation Project and direct staff to reject bids, redesign the project, and <br /> repeat the public bidding process. <br /> FISCAL IMPACT <br /> Funds for the general work of this project have been approved and appropriated in the <br /> Fiscal Year 2010/11 budget as Capital Projects Fund -- Play Equipment Replacement <br /> Program which has an available balance of $721,973.92 as of September 30, 2010. <br /> There are two other park projects, one at Dove Beeger Park and the other at Westwood <br /> Park, that are in the final design stage and will be advertised and scheduled to be <br /> awarded before the end of this year. The estimated cost budgeted for completing these <br /> parks is $400,000. <br /> .�� <br /> Brian Lee, PE CF . S. Pieter Vorametsanti, PE PTOE CFM <br /> Senior Civil Engineer City Engineer <br /> 41°'-■.riga/■Atil V`j2 <br /> Chu Chang, PE LEED A°F' Peter C. Ingram <br /> Building, Infrastructure and City Manager <br /> Transportation Director <br /> ATTACHMENTS <br /> None <br /> RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br /> 1. Contract Documents <br /> 2. Bid Documents <br />
The URL can be used to link to this page
Your browser does not support the video tag.