My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-10-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 1:07:15 PM
Creation date
10/7/2010 3:42:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2A <br /> Page age 1 <br /> To the Honorable Mayor and City Council <br /> From the City Manager <br /> October 11, 2010 <br /> SUBJECT <br /> Final Acceptance—Redwood Shores Levee Improvement Project <br /> RECOMMENDATION <br /> Accept, by motion, the Redwood Shores Levee Improvement Project, and authorize the <br /> release of bonds and the retention according to city procedures. <br /> BACKGROUND <br /> On November 9, 2009, Council awarded the construction contract for the Redwood <br /> Shores Levee Improvement Project to Tucker Engineering for a base bid of <br /> $661,866.35. During the course of the construction work from December 23, 2009 to <br /> January 31, 2010 and from July 19, 2010 to August 6, 2010, two changed orders were <br /> issued for a total credit of $65,682.55 (or 9.9% of base bid), resulting in an adjusted <br /> contract price of$596,183.80. <br /> Most of the credit is the result of design changes such as omitting asphalt paving in <br /> favor of base rock, and deleting a section of slope stabilization work that was deemed <br /> unnecessary in the field. The base rock is a more appropriate surface treatment option <br /> that allows for better adaptation to future improvements. In the future, soil can be <br /> added to the base rock without having to pulverize the asphalt. <br /> Although Council awarded the contract in November of 2009, construction did not begin <br /> until after December 23, 2009, when all necessary state and federal regulatory permits <br /> were obtained. Construction was halted after January 31, 2010 due to the start of the <br /> California Clapper Rail nesting season, as directed by the U.S. Fish and Wildlife Service <br /> (USFWS). Levee work could not resume until after September 1, 2010, the conclusion <br /> of the nesting season. At that time, the City directed its environmental consultant to <br /> conduct a clapper rail survey, and clapper rails were not detected around the levee <br /> construction area. The result of that survey, as well as a request to resume levee <br /> construction work prior to September, was submitted to the USFWS for consideration. <br /> construction work was granted on June 14, 2010. Tucker <br /> Authorization to resume levee constru 9 <br /> Engineering resumed construction work on July 19, 2010, with substantial completion <br /> achieved on August 6, 2010. <br /> The Redwood Shores Levee Improvement Project is in response to the Federal <br /> Emergency Management Agency's (FEMA) levee certification mandate. A draft levee <br /> certification package has been sent to FEMA for review, and mostly administrative <br /> comments, such as submitting post-construction as-built drawings, have been received. <br /> This project involved grading and earthwork to raise the levee height by an average of <br /> one to two feet for approximately 17,300 feet of levee surrounding the Redwood Shores <br /> to meet FEMA's standard. <br />
The URL can be used to link to this page
Your browser does not support the video tag.