Laserfiche WebLink
Utilities <br />availability of utilities and associated costs if any utilities are not currently located within 100 feet of a property line of the <br />iik <br />Availabil <br />Cost to bring Service to Site (Ineligible) <br />1. Electricity <br />Yes O No O <br />> <br />$ <br />2. Fiber Optic Cable <br />Yes O No O <br />> <br />$ 0 <br />3. Telephone <br />Yes O No O <br />> <br />$ <br />4. Gas <br />Yes O No O <br />> <br />$ <br />5. Cable TV <br />Yes OO No O <br />> <br />$ <br />6. Storm Sewer <br />Yes OO No O <br />> <br />$ <br />7. Sanitary Sewer <br />Yes OO No O <br />> <br />$ <br />8. Water <br />Yes OO No O <br />> <br />$ <br />Site Development <br />(All off-she costs beyond 100 foot ufildy tie -Ins are local ineligible expenses, but shall be Identified and included in the budget estimate under ineligible site <br />Version 1.3 (5130/02) 22 <br />Site Development Costs <br />Eli ible <br />Ineligible <br />1. <br />Utilities ................................... ............................... <br />> <br />$ <br />199,338 <br />$ <br />2. <br />Cut, Fill & Rough Grading ........... ............................... <br />> <br />$ <br />329,155 <br />$ <br />3. <br />Special Foundation Support (pilings, etc.) .................... <br />> <br />$ <br />414,423 <br />$ <br />4. <br />Paving, curbs, gutters & sidewalks .............................. <br />> <br />$ <br />674,989 <br />$ 15,395 <br />5. <br />Retaining Walls ........................ ............................... <br />> <br />$ <br />288,461 <br />$ <br />6. <br />Landscaping ............................ ............................... <br />> <br />$ <br />264,359 <br />$ <br />7 . <br />Signage ................................... ............................... <br />> <br />$ <br />0 <br />$ <br />8 . <br />Lighting ..................................... ............................... <br />> <br />$ <br />64,103 <br />$ <br />9. <br />Removal of underground tanks ..... ............................... <br />> <br />$ <br />0 <br />$ <br />10. <br />Removal of toxic materials .......... ............................... <br />> <br />$ <br />0 <br />$ <br />11. <br />Rock removal ................................................... <br />I..... > <br />$ <br />0 <br />$ <br />12. <br />Traffic signals .......................... ............................... <br />> <br />$ <br />0 <br />$ <br />13. <br />Other (Specify): Site Drainage for Bioswales <br />> <br />$ <br />64,101 <br />$ <br />14. <br />Other (Specify): <br />> <br />$ <br />$ <br />15. <br />TOTAL SITE DEVELOPMENT COSTS: ..................... <br />> <br />$ <br />2,288,929 <br />$ 15,395 <br />Version 1.3 (5130/02) 22 <br />