My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-03-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 11:45:13 AM
Creation date
3/20/2003 3:13:44 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
3/24/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Utilities <br />availability of utilities and associated costs if any utilities are not currently located within 100 feet of a property line of the <br />iik <br />Availabil <br />Cost to bring Service to Site (Ineligible) <br />1. Electricity <br />Yes O No O <br />> <br />$ <br />2. Fiber Optic Cable <br />Yes O No O <br />> <br />$ 0 <br />3. Telephone <br />Yes O No O <br />> <br />$ <br />4. Gas <br />Yes O No O <br />> <br />$ <br />5. Cable TV <br />Yes OO No O <br />> <br />$ <br />6. Storm Sewer <br />Yes OO No O <br />> <br />$ <br />7. Sanitary Sewer <br />Yes OO No O <br />> <br />$ <br />8. Water <br />Yes OO No O <br />> <br />$ <br />Site Development <br />(All off-she costs beyond 100 foot ufildy tie -Ins are local ineligible expenses, but shall be Identified and included in the budget estimate under ineligible site <br />Version 1.3 (5130/02) 22 <br />Site Development Costs <br />Eli ible <br />Ineligible <br />1. <br />Utilities ................................... ............................... <br />> <br />$ <br />199,338 <br />$ <br />2. <br />Cut, Fill & Rough Grading ........... ............................... <br />> <br />$ <br />329,155 <br />$ <br />3. <br />Special Foundation Support (pilings, etc.) .................... <br />> <br />$ <br />414,423 <br />$ <br />4. <br />Paving, curbs, gutters & sidewalks .............................. <br />> <br />$ <br />674,989 <br />$ 15,395 <br />5. <br />Retaining Walls ........................ ............................... <br />> <br />$ <br />288,461 <br />$ <br />6. <br />Landscaping ............................ ............................... <br />> <br />$ <br />264,359 <br />$ <br />7 . <br />Signage ................................... ............................... <br />> <br />$ <br />0 <br />$ <br />8 . <br />Lighting ..................................... ............................... <br />> <br />$ <br />64,103 <br />$ <br />9. <br />Removal of underground tanks ..... ............................... <br />> <br />$ <br />0 <br />$ <br />10. <br />Removal of toxic materials .......... ............................... <br />> <br />$ <br />0 <br />$ <br />11. <br />Rock removal ................................................... <br />I..... > <br />$ <br />0 <br />$ <br />12. <br />Traffic signals .......................... ............................... <br />> <br />$ <br />0 <br />$ <br />13. <br />Other (Specify): Site Drainage for Bioswales <br />> <br />$ <br />64,101 <br />$ <br />14. <br />Other (Specify): <br />> <br />$ <br />$ <br />15. <br />TOTAL SITE DEVELOPMENT COSTS: ..................... <br />> <br />$ <br />2,288,929 <br />$ 15,395 <br />Version 1.3 (5130/02) 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.