(�"2 8 -28 <br />I Normal Public Construction Costs in the ADDlicant's Area <br />a romrynewaoreryoundmg or <br />Construction Cost Index Approach: <br />To justify the eligible projected construction cost estimate for new construction, applicants shall complete the following: <br />1) January 2002 current costs per square foot: <br />A. For new facilities: $202 ISF <br />B. For square footage added to an existing building, i.e. "expansions ": $238 ISF <br />Multiply the appropriate County Locality adjustment Factor (29) by the appropriate now cost per square foot figure (2C) (See section 2036 (c) (1) to obtain the "Locally <br />Adjusted Construction Cost per Square Poor' figure (21t): <br />County Locality Appropriate <br />2)A County: > San Mateo B. Adjustment Factor:> 1.14 X C. New CostISF:> $ 202 ISF = D. > $ 230 ISF <br />Name of Project County (Select: lA or 113) <br />anni U7 X_ 202 ISF 216 ISFI <br />Locally Adjusted Construction Cost Per Square Foot: > $ 230 ISF <br />(Reenter Line 2D) <br />The "Locally Adjusted Construction Cost per Square Foot" (3A) figure may be increased by 115 percent per month for each month from January 1, <br />2002, through to the estimated mid -point of construction of the project. <br />Multiply the number of months (4A) times .002 (115%) to gat an inflation factor (49). Multiply the Inflation factor (49) times the "Locally adjusted Construction Costper <br />Square Foot" figure (4C) to get an Additional Cost per Square Fool' figure (40) <br />Number Inflation Locally Adjusted Additional$ISF <br />4) A. of Months:> 56 X.002 = B. Factor: > . 112 X C. Construction $ISF: > $ 230 ISF = D. > $ 26 ISF <br />(Reenter 3A) <br />n it <br />Add the resulting "Additional Cost per Square Fool' figure (SA) to Me "LocalyAdjusted Construction Costper Square Foot" figure (59) to get the "Eligible Projected <br />Construction Cost per Square Fool' figure (5q: <br />Additional Locally Adjusted Eligible Projected <br />5) A. Cost/SF: > $ 26 ISF + B. Construction $ISF: > $ 230 ISF = C. Construction $ISF: > $ 256 ISF <br />(Reenter 4D) (Reenter 4C) <br />iw ,, <br />The total "Eligible Projected Construction Cost' for the project is calculated by multiplying the "Eligible Projected Construction Cost per Square <br />Foot" figure (5C) by the total number of square feet of new construction: <br />The Eligible Projected Construction $ISF: > $ 256 ISF <br />Multiplied By (Reenter 5C) <br />The Square Footage of New Construction: > 22,558 SF <br />Equals <br />The Eligible Projected Construction Cost: > $ 5,774,848 <br />If the projected construction cost estimated by the project architect is lower than the figure in Line 8, the applicant shall use the lower figure as the <br />normal public construction cost in the applicant's area. <br />A 10% project confingency amount is allowed and is calculated by multiplying the total Eligible Projected Construction Cost by 10 %: <br />g) Eligible Contingency: (10% of Line 8) > $ 577,485 <br />Version 1.3 (5/30/02) <br />