My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-03-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 11:45:13 AM
Creation date
3/20/2003 3:13:44 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
3/24/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Z B- <br />Comparable Public Construction Approach: <br />As an alternate to the Construction Cost Index approach to estimating normal construction costs in the applicants area, the applicant may employ a local public construction cost <br />comparison approach to calculate the Eligible Projected Construction Cost figure . [See section 20436 (c) (3)[. List a minimum of three comparable public construction projects that <br />have been bid within the applcents County within three years of the Board's deadline for application. <br />Comparable public construction projects am public libraries, community colleges, post offices, museums, courthouses, city halls, auditoriums, convention centers, civic centers, senior <br />citizens centers, public schools, and recreation centers. <br />The costs listed shall be for construction of the building only and exclusive of any site acquisition, demolition, development, ul lifies, or landscaping; surface and under <br />building parking; works of art; shelving; furniture; bulb -In service desks, counters, workstations, or other casework; movable equipment; or architectural and <br />engineering fees. <br />Construction <br />Proiect Date Bid Cost/SF Example <br />A. > $ ISF <br />B. > $ ISF <br />C. > $ ISF 220 <br />D. > $ ISF 1 ISF <br />E. TOTAL > $ ISF $ 660 ISF <br />10) Locally Determined Comparable Cost per Square Foot ($ISF): <br />> $ ISF Divided by > _ > $ 0 ISF <br />Re -enter Line E N of Projects Locally Determined Comparable <br />Cost per square Foot <br />iwzatn* -4 660 ISF r <br />The "Locally Determined Comparable Cost per Square Foot" (10) figure may be increased by 115 percent per month for each month from January <br />1, 2002, through to the estimated mid -point of construction of the project. <br />Multiply the number of Months (11A) times. 002(115%) to get an Inflation factor (1111). Multiply the inflation factor (11B) times the "Locally Determined Comparable Cost <br />per Square Foor' figure (11C) to get the Addidonal Costper Square Foot" figure (11D): <br />Number Inflation Locally Determined <br />11) A. of Months: > _ X .002 = B. Factor: > X C. Comparable $ISF: > 0 ISF = D. > $ ISF <br />(115 %) (Re-enter 1(l) <br />Adding the resulting Additional Cost per Square Froot" figure (12A) to the "Locally Determined Construction Costper Square Foot" figure (12B) gives <br />the "Eligible Projected Construction Cost per Square Foot' figure (12C): <br />Additional Locally Determined Eligible Projected <br />12) A. Cost[SF: > $ ISF + B. Construction $ISF: > 0 ISF = C. Construction $ISF: > $ ISF <br />(Re-enter 11D) (Re-enter 11C) <br />The "Eligible Projected Construction Cost" is calculated by multiplying the "Eligible Projected Construction Cost per Square Foot' <br />figure (12C) times the square footage of new construction: <br />13) The Eligible Projected Construction $ISF: > $ ISF <br />Multiplied By (Re-enter 12c) <br />14) The Square Footage of New Construction: > SF <br />Equals <br />15) The Eligible Projected Construction Cost: > $ <br />If the projected construction cost estimated by the project architect is lower than the figure in Line 15, the applicant shall use the lower <br />figure as the normal public construction cost in the applicant's area. <br />A 10% project contingency amount is allowed and is calculated by multiplying the total Eligible Projected Construction Cost by 10 %: <br />16) Eligible Contingency: (10% of Line 15) > $ <br />Version 1.3 (5/30/02) 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.