Laserfiche WebLink
APR -04 -2003 FRI 05:12 PM THE INNISFREE COMPANIES FAX NO. 4153325417 P. 04 <br />APR. 4.2003 61 WPM D.E.S. ARCHITECTS 6% 364 PAIS N0.557 P.4i4 <br />VA <br />■ <br />Apr04,20 8 <br />PAV AFfA <br />Additional steel to transfer loads to fewer supports: $1013,000 $200,000 <br />Reduced need to mim utlrBles In the ghat 8100.000 22moop <br />7otel increase In oostr <br />$400,000 $10195,0013 <br />Naturally M you want to tine tune this onalyals (rather then this order- of-magnRude <br />estimats) we should prepare sketches and have your contractor develop prices. But <br />even at this level of estimating It would seem that changing the shuotural concept, at this <br />stage In the process, would increase the overall cost significantly, <br />So In summary, we can change to a long span diagonal parking ON pattern, but we <br />believe It will cast more to do ft. Cali me it you have any questions. <br />Sincerely, <br />DES Arnhftects 7 Engineers, Inc. <br />Stephen D. Wncey,P.E. <br />CEO, Principal <br />DFAAr4,Msas r Enikwn, Inc h`,7:Wr.rny�,9.F.w.;l93LUn �,.vu,a„r, w,r,ui:wn a.6•�•�.a.c <br />wow <br />