My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-04-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:33:19 PM
Creation date
4/10/2003 11:58:04 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
4/14/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-4.1 CITY OF REDWOOD CITY, CALIFORNIA <br />Date: February 19, 2003 <br />Project: 2001 -2002 Tree Preservation and <br />Sidewalk Repair Program <br />Previous Change Orders: <br />This Change Order. <br />Accumulative Total: <br />34,289.49 <br />59,824.87 <br />94,114.36 <br />To: Consortium Consolidate Corp.. <br />You are hereby directed to make the herein described changes from the plans and specifications or do the following described <br />work not included in the plans and specifications of this contract. All new work herein described shall be done in accordance <br />with the applicable provisions of the plans and specifications, except as specifically modified by this contract change order. <br />NOTE: This change order is not effective until approved by the City. This change order Includes all costs and time required to <br />complete the additional work described herein and the contractor shall be entitled to no other compensation. <br />Balance Of Work Approved to Date: <br />DESCRIPTION OF CHANGE <br />COST <br />1. Add 3751 SF to Base Bid Item No. 1, Remove Sidewalk <br />$6001.60 <br />3751 SF X $1.60 /SF <br />2. Add 178 SF to Base Bid Item No. 2, Construct Sidewalk <br />$977.22 <br />178 SF X $5.49/SF <br />3. Add 1371 SF to Base Bid Item No. 3, Remove Driveway <br />$2,193.60 <br />1371 SF X $1.601SF <br />4. Add 1371 SF to Base Bid Item No. 4, Construct Driveway <br />$8 ,911.50 <br />1371 SF X $6.50 /SF <br />5. Add 986 LF to Base Bid Item No. 5, Remove Curb & Gutter <br />$1 ,962.14 <br />986 LF X $1.99 /1-F <br />6. Add 986 LF to Base Bid Item No. 6, Construct Curb & Gutter <br />$25,626.14 <br />986 X $25.99/1-1 <br />7. Add 233 SF to Base Bid Item No. 7, Walkway Removal <br />$463.67 <br />233 SF X $1.99 /SF <br />8. Add 2106 SF to Base Bid Item No. 10, R & R Asphalt Pavement <br />$13,689.00 <br />2106 SF X $6.50 /SF <br />TOTAL $59,824.87 <br />Sheet: <br />Community Development Services - ENGINEERING $ CONSTRUCTION <br />CHANGE ORDER NO: 3 <br />1 of 1 Original Contract Amount: 537,143.00 <br />0 days extension of time will be allowed. <br />By reason of this proposed change <br />The adjusted contract completion date will be <br />March 6, 2003 <br />Submitted By: Charlie Drechsler Title: Junior Engneer Date 2/19/03 <br />Approval Recommended: Gordon Mann Title: Public Works Superintendent Date 2119103 <br />We, the undersigned contractor, have given careful consideration to the change proposed and by agree. If this change order is <br />approved, we will provide II equipment, furnish all terials, except as may otherwise be note ab e, and perform all services necessary <br />for the work above spec ^fiat, and will accept as full r pment thefaQr the prices shown abm e. t t <br />Accepted by: i IXUA A k it�\J ) Title <br />Contractor: <br />City Approval: t Date <br />c1Zi b /pw /cofo rm/mstr <br />
The URL can be used to link to this page
Your browser does not support the video tag.