Laserfiche WebLink
CITY OF REDWOOD CITY, CALIFORNIA 7. I G- <br />Public Works Services — RIGHT -OF -WAY MAINTENANCE <br />CHANGE ORDER NO: 4 <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />Sheet: <br />Date: <br />1 of 2 <br />March 27, 2003 <br />Project: 2001 — 2002 Tree Preservation and <br />Sidewalk Repair Program <br />Original Contract Amount: $537,143.00 <br />Previous Change Orders: $94,114.36 <br />This Change Order: <br />Accumulative Total: <br />$80,408.54 <br />$174,522.90 <br />To: Consortium Consolidate Corp. <br />You are hereby directed to make the herein described changes from the plans and specifications or do the following described <br />work not included in the plans and specifications of this contract. All new work herein described shall be done in accordance <br />with the applicable provisions of the plans and specifications, except as specifically modified by this contract change order. <br />NOTE: This change order is not effective until approved by the City. This change order includes all costs and time required to <br />complete the additional work described herein and the contractor shall be entitled to no other compensation. <br />DESCRIPTION OF CHANGE <br />Add 5902 SF to Base Bid Item #1, Remove Sidewalk <br />5902 SF x $1.60 /SF <br />Add 4501 SF to base Bid Item #2, Construct Sidewalk <br />4501 SF x $5.491SF <br />Add 1074 SF to Base Bid Item #3, Remove Driveway <br />1074 SF x $1.60 /SF <br />Add 1074 SF to Base Bid Item #4, Construct Driveway <br />1074 SF x $6.50 /SF <br />Add 743 LF to Base Bid Item #5, Remove Curb and Gutter <br />743 LF x $1.99/LF <br />Add 743 LF to Base Bid Item #6, Consruct Curb and Gutter <br />743 LF x $25.99/LF <br />Add 142 SF to Base Bid Item #7, Remove Walkway <br />142 SF x $1.99/SF <br />Add 2102 SF to Base Bid Item #8, Construct Wheelchair Ramp <br />2102 SF x $6.50 /SF <br />Subtract 57 EA from Base Bid Item #9, Root Prune Trees <br />57 EA x $120 /EA <br />10. Add 2220 SF to Base Bid Item #10, Remove and Replace Asphalt Pavement <br />2220 SF x $6.50 /SF <br />11. Subtract 673 LF from Base Bid Item #11, Install Irritgation Systems <br />673 LF x $1.99/LF <br />12. Subtract 143 EA from Base Bid Item #12, Install Curb Drains <br />143 EA x $20 /EA <br />13. Subtract 19 CY from Base Bid Item #13, Additional Excavation <br />19 CY x $30 /CY <br />COST <br />$9,443.20 <br />$24,710.49 <br />$1,718.40 <br />$6,981.00 <br />$1,478.57 <br />$19,310.57 <br />$282.58 <br />$13,663.00 <br />($6,840.00) <br />$14,430.00 <br />($1,339.27) <br />($2,860.00) <br />($570.00) <br />TOTAL $80,408.54 <br />Page 1 of 2 <br />