My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-04-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:31:06 PM
Creation date
4/24/2003 4:02:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
4/28/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scope of Services, Page - EXHIBIT A - 5A. ' <br />8. Preferred catalog furnishings selections <br />a. Lighting type 1 <br />b. Lighting type 2 <br />C. Seating <br />d. Trash Receptacle <br />e. Bollard <br />f. Bicycle Rack <br />g. Planter pot 1 <br />h. Planter pot 2 <br />i. Drinking Fountain <br />9. Recommended plant material palette <br />a. Coordinate with City, SFE and arborist subconsultant on recommended species <br />(note: SFE will retain an arborist for review of recommended species in terms of <br />latest horticultural advice and current nursery availability) <br />b. Tree type 1 <br />C. Tree type 2 <br />d. Plant material 1 <br />e. Plant material 2 <br />f. Plant material 3 <br />N <br />AI <br />10. Recommended color and materials samples <br />a. Paving color /material 1 <br />b. Paving color /material 2 <br />C. Masonry furnishing color /material 1 <br />d. Masonry furnishing color /material 2 <br />e. Metalwork paint color /finish <br />11. Provide photoreduced copies <br />Concept -Level Cost Estimate — Note: the concept level cost estimate will be delivered 3 weeks <br />after completion of the preferred design concept package. <br />1. Prepare package for estimator (SFE) including quantity take -offs; coordinate with electrical <br />engineer to include parameters for special events audio and power (note — summary <br />memorandum of assumptions for electrical service will be provided); coordinate with <br />estimator <br />2. Minimal cost research for selected items <br />3. Receive /review draft cost estimate; Q &A with estimator <br />4. Receive /review edited report; forward with memo to City <br />City Staff Meeting — Review and Finalize Preferred Concept Design <br />Prepare large format graphics and presentation <br />P. <br />2. Attend Meeting, record Staff direction and comments <br />Modify final design concept alternatives per City Staff comments — Note: As previously, the <br />task effort levels shown for modifications directed by City Staff are estimates of average levels of <br />
The URL can be used to link to this page
Your browser does not support the video tag.