My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-05-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:27:49 PM
Creation date
5/8/2003 4:36:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/12/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0.c -5 <br />Aureements <br />1. Acquisition of Project Site This Agreement is expressly conditioned upon <br />the acquisition by the City, including, if applicable, order(s) of prejudgment possession, <br />of the remainder of the Project Site; provided, however, that in the event City is unable <br />to acquire the Project Site, this Agreement shall terminate and City and Agency shall <br />reimburse Developer for pre - construction design costs incurred by Developer as of the <br />date of termination. <br />2. Scope of Work Developer shall be responsible for providing all <br />personnel, equipment, materials and services, either itself or through consultants <br />acceptable to City, required to design, obtain permits and provide construction <br />administration for the Public Parking Facility described in the DDA (the "Services "), as <br />more fully described in Exhibit A and shown on Exhibit B attached hereto and <br />incorporated herein by reference. In addition, Developer shall be responsible for <br />coordinating with Pacific Gas and Electric ( "PG &E "), SBC /Pack Bell ( "PacBell ") and <br />any other utilities with facilities affected by the Project for the relocation of their private <br />utility lines as required for the Project, which relocation work shall be performed by the <br />respective utility, at its cost. <br />Developer shall have all construction documents for the Project processed <br />through approval by the City, Agency, and all other agencies with jurisdiction prior to <br />construction. All design documents and construction contracts must be submitted to the <br />City by (August 1, 2003) for review and approval, and shall be in accordance with the <br />City's revised specifications entitled "Engineering Standards of the City of Redwood <br />City," adopted January 5, 1998 which standards are on file in the office of the Manager, <br />Engineering and Construction Department, latest edition of the Uniform Building Code, <br />and all other statutes, laws, regulations or ordinances of authorities with jurisdiction over <br />the Project. Said Work shall also be constructed in strict compliance with the provisions <br />of Article VII, Chapter 29 of the Code of the City of Redwood City. If any conflict exists <br />between the plans and specifications and said Chapter 29 in regard to the standard for <br />a particular improvement, the stricter standard shall govern. <br />F:Atty /Agr /Agr.119 <br />050803 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.