Laserfiche WebLink
D. MECHANICAL HARVESTING <br /> <br /> Mechanical harvesting of Algae and Widgeon Grass shall be performed, as a result <br /> of Water Quality Monitoring described above. -The-harvesting shall be performed <br /> when the Widgeon Grass is within one foot of the lagoon surface or sooner, if it is <br /> determined that to wait would jeopardize, the beneficial uses of the lagoon. <br /> Waterworks Industries staffing and equipment includes one senior technician, one <br /> staff technician, eight foot head mechanical harvester conveyer trailer, 25,000 <br /> GVW vehicle to tow trailer, fuel. <br /> <br /> Should the growth, of the Widgeon Grass or algae accelerate beyond the ability for <br /> one harvester to proactively handle the growth, Waterworks Industries will bring in <br /> our second Harvester within 24 hours of identifying the accelerated growth. As per <br /> our staff; Waterworks Industries is prepared to handle the acceleration of the <br /> vegetation growth in an. expeditious manner. <br /> <br />E. CHEMICAL APPLICATIONS <br /> 1. ALGAECIDE <br /> <br /> The Redwood Shores Lagoon Manaqement Plan calls for the use of the <br /> algaecide/bacticide EarthTec, which is approved for its Iow copper <br /> concentrations and bacticide properties. Waterworks Industries staffing and <br /> equipment for chemical applications include the chemical EarthTec, boat with <br /> motor, spray equipment, one licensed chemical applicator and one staff <br /> technician. <br /> <br /> 2. HERBICIDE <br /> <br /> The- Redwood Shores Lagoon Manaqement Plan calls for the use of the <br /> herbicide REWARD, which is approved for the control of Widgeon Grass in the <br /> areas of the lagoon where the harvester is inefficient or unable to harvest the <br /> Widgeon Grass. <br /> <br /> Waterworks Industries staffing and equipment for chemical applications include <br /> the chemical Reward, boat with motor, spray equipment, one licensed <br /> chemical applicator and one staff technician. In the event that an updated <br /> Redwood Shores Lagoon Management Plan permits the use of Cutrine, <br /> Waterworks Industries staffing and equipment for chemical applications of this <br /> herbicide shall be the same as referenced above. <br /> <br /> F. EQUIPMENT LIST <br /> <br /> The following equipment will be dedicated to the Redwood Shores Lagoon <br /> Management Project. The dedicated equipment is as follows: <br /> <br /> A 1 -Eight Foot Cuffing Head Aquatic Harvester. <br /> B 1 -Tilt/Conveyer Trailer for Transport of Harvester and Vegetation. <br /> C. 1 -16.' Fiberglass-Chemical- Application and Water Quality Monitoring <br /> boat <br /> D 1 -Zodiac inflatable Chemical Application and Water Quality Monitoring <br /> boat for small lagoons <br /> E. 1 -Amphibious Unit, for access to all lagoons <br /> 4 <br /> <br /> <br />