My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res59 2930
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1950-1959 partial
>
1959
>
Res59 2930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2010 4:38:54 PM
Creation date
11/8/2010 4:38:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
12/11/1959
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br /> December, 1959 <br /> REDWOOD CITY MUNICIPAL MARINA <br /> ESTIMATE OF COST, PHASE TWO <br /> Unit <br /> Item Descri aion Quantity Price Amount <br /> 1. Stripping-South side Lump sum 900 <br /> 2. Sub -base fill 48,000 sq.ft. .17 8,160 <br /> 3. Untreated rock base <br /> North side 138,100 sq.ft. .10 13,810 <br /> South side 48,000 sq.ft. .10 4,800 <br /> 4. Paving PMS 300,000 sq.ft. .10 30,000 <br /> 5. Valley gutter 520 ln.ft. 3.50 1,820 <br /> 6. Headboard 1,000 ln.ft. 1.00 1,000 <br /> 7. P.M.S. Berm 500 ln.ft. .80 400 <br /> 8. Stand. R/C curb & gutter 1,100 ln.ft. 2.25 2,475 <br /> 9. Stand. R/C 6" vert. curb 5,000 ln.ft. 1.00 5,000 <br /> 10. Elect., including slips Lump sum 9,800 <br /> 11. Parking lighting (conc. electroliers and underground service) <br /> Lump sum 18,000 <br /> 12. Sewer System Lump sum 8,000 <br /> 13. Water system Lump sum 4,200 <br /> 14. Monorail, incl. elect. & float Lump sum 21,200 <br /> 15. Landings, brows, slips, piling <br /> morring rings Lump sum 51,200 <br /> 16. 2 comfort stations @ $6,000 12,000 <br /> 17. Lockers 136 @ $60 8,160 <br /> 18. Relocate Clubhouse building 4,000 <br /> $204,925 <br /> Engineering 12,520 <br /> Surveys 1,000 <br /> Construction staking 4,000 <br /> $222, <br /> Contingency <br /> TOTAL $230,000 <br /> FACILITIES MADE AVAILABLE UNDER PHASE II <br /> 85 Additional Boat Slips <br /> 2 Comfort Stations <br /> Additional Parking <br /> Paving and Curbs <br /> Additional Utilities and Sewer <br /> Monorail Launching <br /> Lockers <br /> "EXHIBIT A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.