Laserfiche WebLink
8.A <br /> � � Page 88 <br /> Pagt 3 <br /> Robert Ctrrroll <br /> 448 Sai�u FraxcicStseey Redwood (xty <br /> • Use pororrs paving suc14 as brick o� stone on sana� or gravel IJ impervioNS I <br /> paving can not be avoided, install aeration devices where located in the <br /> protected zone. <br /> • Use pier foundations with grade beams above grade rather than slab foundatiorr <br /> where located in the root zone. <br /> • Mulch trees prior to construction with a 3 inch layer of course wood chips over <br /> the entire ront zone. <br /> • If temporary haul or access road must encroach the root area of the trees to be <br /> protecte� a� roadbed of S— inches of mulch or gravel shall be created to <br /> minimize soil compaction. <br /> '� If injury should occur to any tree during construction, the consutting arborist <br /> shall be notified as soon as possible so that remedial treatments can be applied <br /> �eriodic inspections by a qualrfied certified a�horist are recommended during <br /> construction, particularly as t�ees are impa�ted by trenching/gradrng <br /> operations Inspeclions at approxrmatety 4 weeks interval would be sufficient to <br /> assess and monitor the effectiveness of the TREE PRESERVATIONPLAN and <br /> to provide recommendations for any additional care ot treatment <br /> ""--�---� <br /> Respec�lly mitte <br /> r�' <br /> �� dalan <br /> Horti lturist/C fied Cortsulting Arborist <br /> APPENDICES <br /> • Sile Plan <br /> • Assumptions and Limiting Condilions <br />