Laserfiche WebLink
. . . � _� � _� $.A <br /> . D � � Page 87 <br /> I � � � � <br /> ��� 3 0 � <br /> Pp� 2 2010 <br /> Rober! Carroll C m �� RED <br /> 948 Samr Francis Street, Redwood Cfry p � N �N� ERV CE3ry <br /> TREE # 3:.Aleppo Pine "Pinus halepensis" <br /> Stands in front, close to south property line, 7 feet to proposed construction <br /> foot print. The trunk diameter measures 21-inches at 4: S feet above ground <br /> level. It stands approximately 30 tall, with average canopy spread of <br /> about 35 feet. Subject tree is severely leaning toward neighbor property with <br /> , top heavy and bad structure. On a sca7e of 1 to S, the tree rates out at a <br /> health of 2 crnd structure of 4, and an overall condition rating of poor. <br /> 3.0 RECOMMENDATIONS: <br /> � Either remove hee # 3, b� install support metal post on lean sid� <br /> • Water all preserved trees within 10 feet from construction footprint to the <br /> saturation prior to construction. <br /> • Additional irrigation may be needed during the hot sum�ner months. <br /> • Prune preserved trees for proper clearance and crown cleaning (remave dead, <br /> dying, broken branches and raise skirt of canopy}. <br /> • Fence out tree pres�rvation area from construchon activity. All required <br /> protective fencing must be placed around the tree preserwadon area S—feet <br /> oulside drip line prior to beginning of construction. The fencing must remain in <br /> ' �lace during the entire construction period to prevent impingenrent of <br /> construction vehicle, materials, spoils, and equipment into or upon the tree <br /> preservation area. <br /> • Construct driveway with minimum grade change, rising pavers on sand or <br /> similar porous materia� This will be less damaging to the trees along the <br /> driveway. <br /> • All fencing must be S-6 feet highly visible plastic fence or metal chain link and <br /> must be secured to metal posts driven into ground spaced no further than IO — <br /> jeet aparx <br /> • No excess soi� additional fi11, liquids, o� construction debris shall be placed <br /> wrthin the root zane of the protected trees <br /> • There must be no gradirig, or surface scraping beneath the drip line of <br /> protected trees. <br /> • Any trenching �nside the dr�p lines ojthe trees should be hand dug. <br /> • Prune roots with a clean and sharp hand runner, lapper or saw. <br /> • Excavated soil may nol be pi[ed or dumped "even temporarily"against trees <br /> trun� <br /> • Park and store malerials outside tlee protective fencing. <br /> • Locate utilities, drains, and other lines to avoid the protected zoree. <br /> • Use directional boring or tunnel when installing utility line. <br />