Laserfiche WebLink
6.1 C <br /> Page 19 <br /> required, DJP&A will only bill for actual time spent. Given the substantial public interest in this <br /> project, it is possible additional DJP&A time and/or involvement by one or more of the technical <br /> subconsultants may be required io respond to comments. In that event, any required additional work <br /> would be completed on a time and materials basis in accordance with the attached charge rate <br /> schedule upon written authorization from the City. <br /> Il. MITIGATION MONITORING AND REPORTING PR4GRAM <br /> DJP&A will prepare a draft Mitigation Monitoring and Reporting Program (MMRP) for the <br /> project, consistent with the level of pro,ject information detai] available. The MMRP will <br /> summarize the mitigation measures identified for all significant impacts, the responsible <br /> implemcntation agency, the monitoring phase, and the enforcement or rnonitorin� agency. A <br /> Draft MMRP will be provided to the City for review and comment with the Final EIR. <br /> YII. ASSISTANCE WITH PREPARATION OF FINDINGS OF FACT <br /> DJP&A wil] prepare a draft of the Resolution of Findings, excluding the statement of overriding <br /> considerations (if necessary), which will be submitted to City staff for their use and <br /> consideration. <br /> 1V. MEETINGS AND COORDINATION <br /> This scope of work includes DJP&A attendance at six to eight meetings with staff and a <br /> tninimum of four public hearings. The cost for these meetings includes travel time and <br /> preparation time. Attendance at additional meetings or public hearings would be on a time and <br /> materials basis in aecordanee with the attached charge rate schedule. <br /> 7 <br /> �� <br />