My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 BKF Engineers (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 BKF Engineers (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2012 10:59:21 AM
Creation date
11/19/2010 2:43:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Design Professional Agreement Seaport Centre Maintenance District-Rip-Rap Replacement
RMP File Number
304.5
Date
11/17/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ApPRaACH <br /> ■` <br /> '�� EXHIBIT A - SC4PE �F WORK <br /> BkF <br /> Task 2b. Incorporate City Comments and Provide 100% SubmittaI <br /> i <br /> City comments will be incorporated into a 100% Submittal that includes Plans and an <br /> Engineer's Opinion of Probable Construction Cost. <br /> Deliverables: <br /> Three (3) copies of Full Size 100%Plans. The Plans will also be provided in electronic <br /> format as using the.PD�format. <br /> � <br /> Task 2—Geotechnical Services ! <br /> � <br /> � <br /> Consultatian wifh project team during design phase: <br /> - Provide consultation during design phase <br /> - Provide review af construction documents � <br /> Task 3.Construcfion Phase Services <br /> Task 3a. Assistance During Construction ; <br /> Assistance witl be provided during the constructian process including shop drawing <br /> review,response to RFI's,and one site visit to prepare the punoh list. <br /> Attendance at the preconstruction tneeting is excluded. <br /> Task 3b. Record Drawings <br /> A limited post-constructian field review of the project area will be perfarmed. We assume <br /> the City will provide BKF with a red-lined markup from the contractor showing deviations ' <br /> from the approved 100%plan set. Red lines and observations from the fieid review will be <br /> incorporated into a record drawing set of plans for the City's records. We assume a <br /> topographic survey will not be required to document as-built conditions. <br /> Deliverables: <br /> Three(3}copies of Full Size,signed and stamped record drawings <br /> Task 3—Geotechnical Services <br /> During the bidding process,we will be available to respond to contractor questions related <br /> to the bid package until a contractor is selected. <br /> Duiing construction,we will suppart your inspection staff in evaluating contractor <br /> submi#als.We will also visually evaluate soil conditions for any necessary excavation or <br /> earthwark,observe placement of any geotextile products and perform up to two 2-hour <br /> visits to observe placement of revetment. <br /> .__.._.__. ..________________._.....__.___........_.._.._._�.._........._.�...._.._.._.._._._.._.._.....:......__.....__...,_..__......_..�_........_...._.:...._.....__..,..._..�...._..._..._..._.:_..__._.__...._.__.__ <br /> City of Red��tooci City—Seaport Cenire Rip-Rap Replacement ProJecl G50.4B2.6300 <br /> Date:Soptember 9,2010(revised�Jl30/10) �w,nv,bkF.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.