My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 BKF Engineers (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 BKF Engineers (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2012 10:59:21 AM
Creation date
11/19/2010 2:43:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Design Professional Agreement Seaport Centre Maintenance District-Rip-Rap Replacement
RMP File Number
304.5
Date
11/17/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. ■,. <br /> ApPROACN <br /> ��' EXHIBIT A - SCQPE OF 1N�RK <br /> Bkf � <br /> Egclusions <br /> The following axe excluded from BKF's scope of services: � <br /> � <br /> Attending meetings in addi#ion to those listed under each Task.Additional meetings will be <br /> charged as an additional service on a time and materia3s basis. � <br /> I <br /> Major revisions to �vork or drawings that are substantiaily complete, provided such i <br /> revisions are not caused by the actior�s of BKF are excluded. <br /> i <br /> Geotechnical Engineering beyond those services specifically included zn this proposal, <br /> utility potholing,and envuonmental reviews are excluded from this Scope of Sarvices. <br /> The City wiil provide the documents required environmental clearance. <br /> � <br /> Landscape plans and vegetation restoration planting plans are excluded. j <br /> 1 <br /> Locating property lines,right-of-way,or easement areas are excluded, Land and easement � <br /> acquisition services are excluded from this scope of services, � <br /> Permit processing and costs including Califoznia Water Quality Control Board, Calzfornia j <br /> Department of Fish and Game and United States Army Corps of Engineers are excluded, � <br /> Modifications to outfalls are excluded from this scope. If we �nd that outfalls reg,uire ; <br /> modifica#ion during our design,we can provide a proposal for those additional services. ! <br /> Levee crest elevation certification is excluded. <br /> Construetion staking is limited to setting temporary benchmarks during the topographic � <br /> survey. A proposal for staking during construction can be provided at a later date once ' <br /> plans have been created. <br /> tlny services not specifically included in the Scope of Servzces are excluded. <br /> i <br />��, ...,_........ __.,..._...._...__..,...._._..._.......___.._...._........:.........__.._._.._.._...........__.._..........:..,__.._...._.._..._._...._...._._..._._.__..___....__,.__..._�..:...____._._...._._..._._.,...___..._.__.._.._.__. <br /> City o(Redvrood Cily—Seaport Centre Rip-Rap Replacement Project 590.482.5300 <br /> Date:September�J,2010(revised 9/30J10) vn�r�r.bkf.can <br /> I <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.