My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Integrated Building Solutions, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Integrated Building Solutions, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2010 2:14:21 PM
Creation date
11/30/2010 2:14:15 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Integrated Building Solutions, Inc.
PROJECT NAME
Technical Consulting Services IBIS Enterprise Energy Management System
RMP File Number
304
Date
11/18/2010
MO Ref
10-208
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City, CA— IBIS Enterprise Energy Management System <br /> • integration Engineering: <br /> o IBS will provide the following Hardware & manage Its Installation: <br /> • (4) Veris CT's <br /> • (4) ICP Pulse Meters <br /> • (4) IBIS Commuriications Panels <br /> o IBS will engineer the following cabling installations: <br /> • Ethernet LAN Drops to the IBIS Communications Panels <br /> • Power Runs to the IBIS Communications Panels <br /> • Electrical & Gas Metering <br /> o Integrated Building Solutions will provide both the installation of CT's used for monitoring <br /> electrical services and the wiring/terminations for natural gas monitoring. All installation and <br /> wiring for new panels and devices shall be included as indicated below unless noted otherwise: <br /> • Police Station: <br /> • Install new Integration panel and 120vac power. <br /> • Install new CT on main breaker. <br /> • Install cable between panel and CT. <br /> • Install cable between integration panel and gas panel <br /> • Install network cable from new Integration panel to IDF room. <br /> ■ Fire Station: <br /> • install new integration panel and 120vac power. <br /> • Install new CT on main breaker. <br /> • Install cable between panel and CT. <br /> • Install cable between integration panel and gas panel <br /> • Install network cable from new integration panel to IDF room. <br /> • MSC Building: <br /> • Install new integration panels and 120vac power. <br /> • Install new CT on main breaker. <br /> • install cable between panel and CT. <br /> • Install cable between integration panel and gas panel <br /> • Install network cable from new integration panel to IDF room. <br /> • RedShores Library: <br /> • Install new Integration panel and 120vac power. <br /> • install new CT on main breaker. <br /> • Install cable between panel and CT. <br /> • Install cable between integration panel and gas panel <br /> • Install network cable from new integration panel to IDF room. <br /> Integrated Building Solutions, Inc. Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.