My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Verde Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Verde Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2010 12:23:43 PM
Creation date
12/2/2010 12:23:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Verde Design, Inc.
PROJECT NAME
Design Professional Agreement , Redwood City Trail Improvements
RMP File Number
304.5
Date
12/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City Trail Improvements <br /> October 22, 2010 <br /> Page 4 <br /> IV. Bid and Construction Phases — Optional Services <br /> The consultant agrees to provide the following services to the City on an on -call basis. The City will <br /> perform inspection services during the construction phase. Verde Design and design team will be <br /> available to: <br /> 1. Respond to questions and issue addenda during the bidding process. <br /> 2. Attend bid opening and assist in the bid evaluation. <br /> 3. Review submittals and shop drawings <br /> 4. Respond to questions, request for information and provide clarifications. <br /> 5. Coordinate As -Built plans and we will provide a cad set of plans reflecting the final as -built <br /> condition. <br /> 6. Construction meetings, site observations and punch list preparation - four site visits / meetings <br /> are included. <br /> PRODUCTS <br /> Verde Design will provide the following products as outlined in the above Scope of Services: <br /> A. Design Development <br /> 1. Meeting agenda and minutes <br /> 2. 50% Package — two sets <br /> B. Construction Documentation <br /> 1. 95% package — two sets <br /> 2. Bid submittal package — one set of signed bond drawings and one hard copy of project <br /> specifications and costs. An electronic copy will be provided in Autocad or PDF format. <br /> 3. Meeting agenda and minutes. <br /> C. Construction Services (Optional Services): provide documentation for RFI responses, submittal review, <br /> field directives and site observation reports. <br /> PROJECT TIMELINE <br /> Verde Design proposes the following general timeline for design: <br /> Design Development: Six Weeks <br /> Construction Documentation: <br /> 95% Submittal: Four Weeks <br /> Back Check / Bid Submittal: Two Weeks <br /> Note: the above timelines does not include any required review time by agency or City staff. <br /> CLIENTS RESPONSIBILITIES <br /> In order to complete the items described in Scope of Services above, we request that City provide the following <br /> information: <br /> Project and Site Information <br /> 1. Any pertinent data including any utilities installed within the project area. <br /> 2. Any specific City or PG &E requests for design and maintenance criteria. <br /> 3. Copy of any recent trail improvement plans completed by the City. <br /> LANDSCAPE ARCHITECTURE 1 CIVIL ENGINEERING I SPORT PLANNING & DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.