Laserfiche WebLink
6.3A <br /> Page 17 <br /> 1 ARTICLE 4 INSTALLATION OF NEW MRF EQUIPMENT <br /> 2 4.01 GENERAL <br /> 3 Contractor has recommended that the Authority purchase the equipment described in ' <br /> 4 Attachment 2-A and illustrated on Attachment 2-C. This recommendation has been <br /> 5 made based on Contractor's analysis of the types and volumes of Recyclable Materials <br /> 6 expected to be delivered to the MRF after the Member Agencies initiate a single stream <br /> 7 collection process, the Authority's goals for materials recovery as incorporated in this <br /> 8 Agreement, and the site constraints of the MRF as it is planned to be reconstructed as <br /> 9 shown on Attachment 2-B. Contractor has had the opportunity to provide input to the <br /> 10 design process and is satisfied that its recommendations on equipment and operational <br /> 11 aspects have been incorporated in the design of the MRF building shown on Attachment <br /> 12 2-B and in the plans and specifications included in the Request for Proposals for <br /> 13 Construction dated March 9, 2009, as modified by the document entitled "SBR Building <br /> 14 Modifications with Budget Effect on SBWMA 070209" dated July 2, 2009. Contractor <br /> 15 has assured the Authority that the equipment recommended will process single stream <br /> 16 Recyclable Materials as specified and required in Attachment 2-E (MRF equipment <br /> 17 performance specification), with the composition described in the system's acceptance <br /> 18 test set forth in Attachment 2-F and will produce materials that meet the product quality <br /> 19 standards set forth in Attachment 2-G. <br /> 20 4.02 PURCHASE OF MRF EQUIPMENT <br /> 21 The Authority intends to execute a contract with Bulk Handling Systems on or before <br /> 22 November 1, 2009 to purchase the MRF equipment. Contractor will, upon request, <br /> 23 assist the Authority in negotiating the terms and conditions of the contract with Bulk <br /> 24 Handling Systems. <br /> 25 4.03 INSTALLATION OF MRF EQUIPMENT <br /> 26 The equipment will be installed by Bulk Handling Systems and is intended to operate as <br /> 27 shown on the drawings contained in Attachment 2. <br /> 28 Contractor has represented to Authority that the equipment, installed as shown on <br /> 29 Attachment 2-C, will achieve the product quality standards as described in Attachment 2- <br /> 30 G. <br /> 31 Upon request by Authority, Contractor will arrange for a technically qualified <br /> 32 representative to be on site at least five (5} days per week during the installation of the <br /> 33 equipment to observe the installation and to advise the Authority. Cu�rently, the parties <br /> 34 expect the equipment installation process will require about 35 weeks, will begin in April <br /> 35 2010, and be completed in December 2010. <br /> 36 4.04 SYSTEMS ACCEPTANCE TEST <br /> 37 Upon completion of the installation, the Contractor shall immediately start up and <br /> 38 operate the MRF equipment for a shakedown period of no less than 10 days and no <br /> 39 more than 20 days prior to commencing the acceptance test. <br /> 40 The acceptance test will be conducted as provided in Attachment 2-F. <br /> 41 The Authority will accept the equipment and allow Contractor to commence full-scale <br /> 42 operation of the MRF when the equipment as installed has satisfied the standards of <br /> 43 performance contained in Attachment 2-F (which include achieving the product quality <br /> Operating Agreement for Shoreway Center <br /> Page - 8 - 7/3oio9 <br />