My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agdapkt 2010-12-06 clsd and regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
Agdapkt 2010-12-06 clsd and regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 10:25:30 AM
Creation date
12/2/2010 3:32:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/6/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3A <br /> Page 27 <br /> 1 1. processed through the scale house operation in no more than five (5) minutes per <br /> 2 vehicle, measured from the vehicle's entry into the scale house vehicle queue, and <br /> 3 2. are able to unload and depart from the Shoreway Center in no more than fifteen (15) <br /> 4 minutes from the time they leave the scale house unless a collection vehicle breaks <br /> S down and causes a traffic back-up beyond Contractor's control. <br /> 6 B. Self-haul customers do not wait more than fifteen minutes (15) to be processed by the <br /> 7 scale and assigned a place to dump. <br /> 8 Should Contractor fail to meet the maximum turnaround time, Liquidated Damages shall be <br /> 9 assessed in the amounts stated in Attachment 10. <br /> 10 5.15 OWNERSHIP OF SOLID WASTE <br /> 11 Once materials are delivered to the Shoreway Center, ownership shall transfer directly from <br /> 12 the deliverer to Contractor. <br /> 13 Materials which are transported to a Designated Processing Facility or the Disposal Site <br /> 14 shall become the property of the owner or operator of the Designated Processing Facility or <br /> 15 Disposal Site once they have been delivered by Contractor, subject to any regulations of <br /> 16 the owner/operator related to unacceptable materials. <br /> 17 5.16 MARKETING OF RECYCLABLE MATERIALS <br /> 18 A. General. Contractor shall use its best efforts in marketing and promoting the sale of all <br /> 19 Recyclable Materials to obtain the highest prices available under prevailing conditions in <br /> 20 the relevant market, whether foreign or domestic. Contractor will exert at least the same <br /> 21 effort in marketing the Recyclable Materials from the Shoreway Center as it does in <br /> 22 marketing materials which it markets for its own account as principal or as an <br /> 23 agenUbroker for any third party. Except as set forth in Attachment 11 B, Contractor shall <br /> 24 not use, sell to, or broker through an Affiliate in the marketing of Recyclable Materials <br /> 25 without notifying the Authority in writing and receiving approval from the Authority in <br /> 26 writing. Contractor shall not use any artifice, business structure or other attempt to <br /> 27 evade this requirement. <br /> 28 B. Materials Marketina Plan. The Materials Marketing Plan (Attachment 11A), describes <br /> 29 Contractor's strategy for optimizing revenues from the sale of Recyclable Materials <br /> 30 recovered at the Shoreway Center. The Materials Marketing Plan includes (1) the <br /> 31 commodity purchasers to which Contractor anticipates marketing each of the major <br /> 32 categories of materials to be recovered at the Shoreway Center; (2) the methods <br /> 33 Contractor will use to (a) determine the reliability of prospective purchasers in terms of <br /> 34 timely pickup, credit worthiness, prompt payment, rejection of materials and/or filing of <br /> 35 claims, and other commercial considerations, and (b) ensure that recovered materials <br /> 36 are handled in an environmentally sound manner and devoted to an end use involving <br /> 37 the creation or manufacture of new products; (3) the maximization of revenues from the <br /> 38 State of California Department of Conservation for materials that have a California <br /> 39 Redemption Value. Contractor shall implement the Materials Marketing Plan. <br /> 40 Attachment 11 B describes the methods by which Cont�actor will provide assurance to <br /> 41 the Authority that revenues Contractor receives from sale of materials (particularly those <br /> 42 sold to Potential Industries, Inc., an Affiliate) are consistent with market prices. <br /> 43 C. Reportinq. Contractor shall submit, concurrently with the quarterly report described in <br /> 44 Section 9.05, a report on materials marketing including a summary of Contractor's <br /> 45 marketing efforts during the preceding quarter, the quantity (in tons) of material sold; <br /> 46 total revenues billed and received; quantity and price data disaggregated by type and <br /> Operating Agreement for Shoreway Center <br /> Page - 1 S - 7/30/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.