My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agdapkt 2010-12-06 clsd and regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
Agdapkt 2010-12-06 clsd and regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 10:25:30 AM
Creation date
12/2/2010 3:32:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/6/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> 6.3A <br /> Page 28 <br /> 1 grade of materials; transportation method including contact information for carriers used <br /> 2 to transport materials from the Shoreway Center to the buyers' location or unloading <br /> 3 point; and information on ultimate market destinations. <br /> 4 D. No Partnership. The Parties intend and hereby agree that their relationship shall be <br /> 5 that of independent contractors with respect to the marketing of Recyclable Materials. <br /> 6 Nathing contained herein shall be construed to create any employment, partnership, <br /> 7 joint venture, co-ownership or agency relationship between the Parties, and Contractor <br /> 8 shall not by any action allow any presumption to arise that a relationship of partnership <br /> 9 exists between the Parties. <br /> 10 5.17 AUTHORITY'S RIGHT TO PERMIT OTHERS TO PROVIDE SERVICES <br /> 11 The Authority may direct the Contractor to perform additional services as provided in <br /> 12 Section 12.13. If the Contractor and Authority cannot agree on terms and conditions for <br /> 13 such additional services within one-hundred twenty (120) days from the date on which the <br /> 14 Authority first requests a proposal from Contractor to pe�form such services, the Authority <br /> 15 may, in addition to its other rights under this Agreement, permit a third party or parties other <br /> 16 than Contractor to provide such services. Contractor will provide such third party or parties <br /> 17 all such access to and use of the Shoreway Center and Authority-owned equipment as <br /> 1 S necessary for such third party or parties to perform all such additional services. The <br /> 19 Authority's rights under this section are in addition to those under Section 9.05.J. <br /> 20 5.18 SELF-HAUL MATERIALS <br /> 21 A. Self-haul Materials. The Contractor shall implement a Self-Haul Diversion Plan as <br /> 22 detailed in Attachment 19. The Contractor shall identify, and segregate for Diversion, <br /> 23 materials from the categories below: <br /> 24 1. Bunker Program materials (inert materials such as dirt, concrete, asphalt, and other) <br /> 25 2. Self-haul Organic materials (plant materials, food scraps) <br /> 26 3. Self-haul C&D materials (wood, concrete, insulation, roofing, metals, drywall) <br /> 27 4. Recyclable Materials (paper, bottles and cans, metals) <br /> 28 5. Other recoverable materials (tires, carpet, carpet padding, foam, plastics) <br /> 29 6. Other materials approved by the Authority. <br /> 30 B. Weighins� of All Self-haul Materials. Contractor shall ensure that Self-haul materials <br /> 31 will be dumped and kept separate from Collection Contractor materials at the Transfer <br /> 32 Station... All outbound loads of diverted Self-haul materials will be weighed before <br /> 33 leaving the Transfer Station or at a State certified scale located at a Designated <br /> 34 Processing Facility and the outbound tonnage will be recorded and reported in the Self- <br /> 35 haul Diversion Report. Self-haul materials intended for disposal do not need to be <br /> 36 weighed separately from Solid Waste at the Transfer Station provided that Contractor <br /> 37 shall provide accurate, separate and complete weights of the Self-haul materials to the <br /> 38 Authority. <br /> 39 C. Self-haul Diversion. Contracto�'s satisfaction of the Self-haul Diversion obligation will <br /> 40 be calculated based on diverted tons of Self-haul material shipped to a Designated <br /> 41 Processing Facility. Alternatively, Contractor may sort Self-haul materials onsite and <br /> 42 into segregated materials streams, and may market segregated Self-haul materials <br /> 43 directly to a buyer that is approved in advance by the Authority. <br /> Operating Agreement for Shoreway Center <br /> Page - 19 - 7/30l09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.