Laserfiche WebLink
6.3A <br /> Page 30 <br /> 1 ARTICLE 6 TRANSPORTATION OF MATERIALS. <br /> 2 6.01 GENERAL <br /> 3 Contractor shall use due care to prevent materials being transported from being spilled <br /> 4 or scattered during transport. If any materials are spilled, Contractor shall at its sole <br /> 5 expense clean up all spilled materials, whether on private or public property. <br /> 6 6.02 TRANSPORTATION OF SOLID WASTE <br /> 7 Contractor shall transport and deliver to the Designated Disposal Site all Solid Waste <br /> 8 that is not recycled or reused. No Solid Waste may be disposed of at any location other <br /> 9 than the Designated Disposal Site without written consent from the Authority. <br /> 10 6.03 TRANSPORTATION OF HAZARDOUS SUBSTANCES <br /> 11 Contractor shall provide or arrange for transportation and delivery to an appropriately <br /> 12 permitted disposal facility of any Hazardous Substances that are not discovered by the <br /> 13 Contractor through the hazardous waste exclusion program (HWEP) or which are <br /> 14 rejected by the operator of the Designated Disposal Site or any designated Processing <br /> 15 Facility. <br /> 16 6.04 TRANSPORTATION OF RECYCLABLE MATERIALS <br /> 17 A. Sinqle Stream Recvclable Materials. Contractor shall provide or arrange for <br /> 18 transportation and delivery of all Single Stream Recyclable Materials to a purchase�, <br /> 19 a licensed recycling facility, or a person who will use the materials in a process or <br /> 20 product and will not dispose or use them at a landfill. <br /> 21 B. Transfer Station Materials. Contractor shal! provide or arrange for transportation to a <br /> 22 Designated Processing Facility of Organic Materials, C8�D materials, and other <br /> 23 Recyclable Materials delivered to and recovered at the Transfer Station. These <br /> 24 materials shall be prepared and delivered in a condition and form which meet the <br /> 25 Designated Processing Facilities' specifications and receiving requirements. <br /> 26 C. E-Waste U-Waste, and Apaliances. Contractor shall supply storage containers for, <br /> 27 and arrange for the transportation of, E-Waste, U-Waste, appliances and other <br /> 28 materials that may be added to the list of Buy BacklDrop-off Center material. At the <br /> 29 request of the Authority, Contractor will pay the cost of transporting these materials. <br /> 30 The handling/disposal costs incurred by Contractor for the use of outside vendors in <br /> 31 the transportation and processing of special wastes collected in the Buy back/Drop- <br /> 32 off Center (e.g., Electronic waste, Universal waste, and batteries, oil, and paint <br /> 33 collected from Customers as part of the services to Member Agencies} and for the <br /> 34 handling and processing of appliances will be reimbursed as a Pass-Through Cost. <br /> 35 6.05 PARKING AND MAINTENANCE OF TRANSFER VEHICLES <br /> 36 Contractor shall park empty Transfer Vehicles at the Shoreway Center in the area(s) <br /> 37 designated for this purpose shown on Attachment 5. Transfer Vehicles containing Solid <br /> 38 Waste shall be parked in areas that prevent liquids that have come in contact with Solid <br /> 39 Waste and/or Recyclable Materials from entering the storm water system. In addition, <br /> 40 Contractor shall use due care generally to prevent liquids that have come in contact with <br /> 41 Solid Waste and/or Recyclable Materials from entering the storm water system. <br /> Operating Agreement for Shoreway Center <br /> Page - 21 - 7l30/09 <br />