Laserfiche WebLink
� <br /> 6.3A <br /> Page 32 <br /> 1 ARTICLE 7 COMPENSATION TO CONTRACTOR <br /> 2 7.01 GENERAL ' <br /> 3 The payments provided for in Sections 7.02, 7.03, 7.06, 7.08 and 7.09 and the share of <br /> 4 Revenues provided in Section 7.07 are the full, entire and complete compensation due <br /> 5 to Contractor for furnishing all labor, equipment, materials and supplies and all other <br /> 6 things necessary to perform all of the senrices required by this Agreement in the manner <br /> 7 and at the time prescribed, and for fulfilling all of its obligations under this Agreement, <br /> 8 including but not limited to observing the installation of the new sorting equipment in <br /> 9 accordance with Article 4, the operation of the Shoreway Center in accordance with <br /> 10 Article 5, and the transportation of materials in accordance with Article 6. The <br /> 11 compensation provided for in this Article includes all costs for the items mentioned <br /> 12 above and also for all taxes, insurance, bonds, overhead, profit and all other costs <br /> 13 necessary or appropriate to perForm the services in accordance with this Agreement. <br /> 14 7.02 REIMBURSEMENT OF PROJECT MANAGEMENT COSTS RELATED TO MRF <br /> 15 SORTING EQUIPMENT INSTALLATION <br /> 16 The Authority will reimburse the Contractor for project management costs actually and <br /> 17 reasonably incurred during the Equipment Manufacturer's installation of the MRF sorting <br /> 18 equipment for a�xed fee of Two Hundred Seventy Six Thousand Four Hundred Sixty <br /> 19 Two Dollars ($276,462). The foregoing amount will be adjusted by 80% of the <br /> 20 percentage change in Index: U.S. Department of Labor, Bureau of Labor Statistics, <br /> 21 Consumer Price Index — All Urban Consumers, U. S. city average (nof seasonally <br /> 22 adjusfed, a11 items, base period: 1982-84=900, series no. cuur0000sa) <br /> 23 between the Effective Date and the date that the equipment is installed and ready for <br /> 24 the shake down period and acceptance test per Section 4.04. <br /> 25 This amount is the full compensation for all Contractor's costs associated with <br /> 26 supervising the installation of the equipment, including coordination with the Equipment <br /> 27 Manufacturer and the Authority's architects, engineers and construction contractor <br /> 28 during installation. <br /> 29 The obligation to reimburse Contractor for these costs accrues upon the equipment's <br /> 30 successful completion of the acceptance tests and the Authority's review and approval of <br /> 31 Contractor's request for reimbursement. The amount due will be paid within thirty (30) <br /> 32 days thereafter. <br /> 33 7.03 BASIC COMPENSATION — GENERAL <br /> 34 Contractor's Basic Compensation consists of three components, related to three <br /> 35 separate processes performed by Contractor. <br /> 36 A. Transfer Station Pavment. The amount of this payment is calculated by multiplying <br /> 37 the number of Tons of material delivered to and processed at the Transfer Station by <br /> 38 the per Ton Transfer Station Fee then in effect. The Transfer Station Fee is $9.71 <br /> 39 per Ton. <br /> 40 B. Recvclable Materials Processinq Pavment. The amount of this payment is <br /> 41 calculated by multiplying the number of Tons of Recyclable Materials delivered to <br /> 42 and processed at the MRF by the per Ton MRF Fee then in effect. The MRF Fee is <br /> 43 $67.36 per Ton. <br /> 44 C. Transportation Pavment. The amount of this payment is calculated by multiplying <br /> 45 the number of Tons of materials transported from the Shoreway Center to the <br /> Operating Agreement for Shoreway Center <br /> Page - 23 - 7i3oio9 <br />