My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agdapkt 2010-12-06 clsd and regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
Agdapkt 2010-12-06 clsd and regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 10:25:30 AM
Creation date
12/2/2010 3:32:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/6/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3A <br /> Page 33 <br /> 1 Designated Disposal Site, and the Designated Processing Facilities for inerts, <br /> 2 Construction and Demolition Debris, Plant Materials and Organics by the number of <br /> 3 one-way standard miles from the Shoreway Center to the Disposal Site or <br /> 4 P�ocessing Facility and by the applicable Transportation Fee then in effect. The <br /> 5 Transportation Fees for the five types of materials are $1.007 per Ton/Mile for Solid <br /> 6 Waste, $1.043 per Ton/Mile for inerts, $0.688 per Ton/Mile for C&D debris, $0.614 <br /> 7 per Ton/Mile for Plant Materials, and $0.745 per Ton/Mile for Organics. Tons <br /> 8 delivered to the Designated Disposal Site do not include MRF �esidue. <br /> 9 7.04 ADJUSTMENT OF PROPOSED FEES TO RATE YEAR ONE (2011) AND <br /> 10 MODIFICATION DURING INTERIM OPERATIONS <br /> 11 For Rate Year One, the parties expect to make a cost adjustment based on various cost <br /> 12 indices. In addition, since the full-scale operation of the MRF will not occur until <br /> 13 February 2011, the MRF Fee will be subject to a one-time modification. <br /> 14 A. Adiustment. The parties expect that the costs underlying the fees described in <br /> 15 Section 7.03.A, B and C will change between the date of this Agreement and the <br /> 16 year in which they will first be paid (2011). <br /> 17 The Authority will adjust the Transfer Station Fee, the MRF Fee, and the five <br /> 18 Transportation Fees in October 2010, following the procedure described in <br /> 19 Attachment 12-A and illustrated in Attachment 12-B, after receipt of Contractor's <br /> 20 application described in Section 7.12. <br /> 21 The fees, as so adjusted, will be paid during Rate Year One (2011), as earned. <br /> 22 B. Modi�cation for a Part of Rate Year One (2011). Since full-scale operation of the <br /> 23 MRF and Transfer Station are not expected to occur until February and March, <br /> 24 respectively, of Rate Year One, the Basic Compensation will need to be modified to <br /> 25 reflect the reduced scale of operations. During this interim operations period, <br /> 26 Contractor will be paid Basic Compensation as provided in Attachment 12-C. Once <br /> 27 the MRF and Transfer Station are fully operational, the Basic Compensation, <br /> 28 adjusted as described in subsection A above, will be paid during the remainder of <br /> 29 Rate Year One, as eamed. <br /> 30 7.05 ADJUSTMENT OF BASIC COMPENSATION IN SUBSEQUENT RATE YEARS <br /> 31 The Authority will adjust the Transfer Station Fee, the MRF Fee, and the five <br /> 32 Transportation Fees in October 2011 and in October of each subsequent year during the <br /> 33 Term, following the procedure described in Attachment 13-A and illustrated in <br /> 34 Attachment 13-B. <br /> 35 The fees, as so adjusted, will be paid during the immediately following Rate Year, as <br /> 36 earned. <br /> 37 7.06 SUPPLEMENTAL PROCESSING FEES <br /> 38 A. Materials Delivered to MRF. If Contractor elects, or if the Authority directs <br /> 39 Contractor, to process loads of Recyclable Materials delivered to the MRF by the <br /> 40 Collection Contractor which contain more than fifteen percent (15%) contamination, <br /> 41 Authority will pay Contractor a supplemental fee to cover the additional cost of <br /> 42 processing this material. The amount of this supplemental fee will be �25 per ton <br /> 43 (applied to all tons over fifteen percent (15%) contamination) in Rate Year One. It <br /> 44 will be adjusted in subsequent years by the same percentage as that used to adjust <br /> 45 the MRF Fee described in Section 7.03.B. <br /> Opera6ng Agreement for Shoreway Center <br /> Page - 24 - 7l30/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.