Laserfiche WebLink
6.1 A <br /> Page 3 <br /> FISCAL IMPACT <br /> Sufficient funding for the San Carlos Airport Levee Improvement Project was <br /> encumbered at award of contract from the GID 1-64 Facilities Charge Consfruction <br /> Fund -- Exterior Levee Certification. <br /> Approximately $2,700,000.00 was spent on the levee improvement and certification <br /> effort including coastal study, geotechnical design, civil engineering design, <br /> environmental permitting, and construction. San Carlos will reimburse Redwood City <br /> approximately $170,000.00 which is the cost of the work done on their behalf. The cost <br /> of the work done on behalf of the County of San Mateo is approximately $740,000.00. <br /> The primary funding sources for the levee system certification effort were the Capital <br /> Projects Fund -- Levee FEMA Compliance Start Up and the General Improvement � <br /> District 1-64 Facilities Charge Construction Fund -- Exterior Levee Certification. <br /> . C�-�-- ��---a , <br /> Grace Le E S. P ter Vorametsanti, PE, PTOE, CFM <br /> Senior vil Engineer City Engineer <br /> � �.--�-� ���.�",��.� � <br /> Chu Chang, PE, LEED AP Robert B. Bell �� <br /> Director, Building, Infrastructure, and Interim City Manager i <br /> Transportation I <br /> ATTACHMENTS <br /> Map of flood control levee segments <br /> RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br /> Copies of the levee certification submittals (Redwood City, San Carlos, and San Mateo County) <br /> �I <br /> I, <br /> I � <br />