My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agdapkt 2010-12-06 clsd and regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
Agdapkt 2010-12-06 clsd and regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 10:25:30 AM
Creation date
12/2/2010 3:32:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
12/6/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTAC�-I ge 36 <br /> r� <br /> , <br /> Anticipated Development in the District <br /> The Developer has provided fhe following information with respect to development within <br /> the District. No assurance can be given that all information is complete. No assurance can be <br /> given that development of the property will be completed, or that it will be completed in a timely <br /> manner. Since the ownership of the parcels is subject to change, the development plans <br /> outlined below may not be continued by a subsequenf owner if the parcels are sold, although <br /> development by any subsequenf owner will be subject to fhe Peninsula Park Precise Plan, fhe <br /> Development Agreement between the City and R. C. Peninsula Park, LLC, the One Marina <br /> Planned Community Permit, tentative maps, and fhe policies and requirements of the City. No <br /> assurance can be given that the plans or projections detailed below will actually occur. <br /> Planned development within the District is locally referred to as the "One Marina" project <br /> and encompasses 33.24 acres planned by the Developer and entitled by the City for 231 single- <br /> family residential units in twenty-four buildings, a hotel of up to 200 rooms and 10,000 square <br /> feet of community serving commercial space, all (other than residential units sold as <br /> "affordable") to be subject to a Special Tax; as well as a preserved marina basin of <br /> approximately 13.79 acres, three on-site parks, inner and outer esplanades and a public hand <br /> boat launch, all of which is initially subject to a Special Tax as undeveloped property but which <br /> is expected to be exempt when the Project is completed. <br /> The residential portion is planned for approximately 16.6 acres and the commercial <br /> portion for approximately 2.8 acres. Of the residential use area, approximately 9.64 acres is <br /> expected to be utilized for the 231 homes, hotel and commercial uses. The balance of the land <br /> will be used for roadways, parks, open space and owner's association property, all to be exempt <br /> from the Special Tax. Additionally, the property includes the approximate 13.79 acres which is a <br /> preserved marina basin connected to the San Francisco Bay and will be permanently <br /> undevelopable and is initially subject to the Special Tax as undeveloped land but will likely be <br /> exempt in the future as homeowners association property. <br /> The Developer has been involved in planning and entitling the Project for over 10 years. <br /> The originally planned project, to be known as Marina Shores Village, included 1,900 residential <br /> units in multiple towers up to 240' in height, retail and office space and a separate property <br /> known as Petes Harbor. The Marina Shores Village project was approved by the Redwood City <br /> City Council and Planning Commission and an Environmental Impact Report (EIR) was <br /> completed for it, but the project approval was overturned by a voter initiative known as Measure <br /> Q in 2004. Development of a revised project including up to 796 residential units, a hotel of up <br /> to 200 rooms and 10,000 square feet of community serving retail called Peninsula Park, was <br /> again approved by the City but was subsequently blocked by the State's Regional Water Quality <br /> Control Board, United States Army Corps of Engineers and other federal agencies, which would <br /> not allow the Developer to fill in part of the marina basin. The current project eliminates the <br /> towers and all marina fill and is now entitled by the City for construction of townhomes as high <br /> as three stories on the upland portion of the property. The current One Marina project requires <br /> no marina fill and can be constructed without recertification of the Environmental Impact Report <br /> or amendment to the existing Precise Plan completed for the proposed Peninsula Park project. <br /> United States Army Corps approval will be required for limited bank stabilization in the park <br /> areas and installation of the hand boat launch and planned 20 to 40 non commercial boat slips. <br /> Residentia/ Component. The 231 residential units will be a for-sale product contained <br /> within 24 detached structures. Although the buildings resemble an attached, townhome design, <br /> -22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.