My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br /> IUENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Performance Criteria Entit Verification Enti Re uirements <br /> residential and commercial receptors. activities, which conditions shall during grading and <br /> Noise levels at 50 feet from the require the following conventional construction. <br /> demolition o� construction equipment construction-period noise abatement <br /> source could reach approximately 105 measures: <br /> dBA, resulting in intermittent <br /> interference wiih typical resideniiai and • Construction Plan. Prepare a <br /> business activities, and exceeding the detailed construclion plan <br /> City's land use/noise compatibility identifying the schedule for major <br /> guidelines. This possibility represents a noise-generating construction <br /> potentially significant impact. activities. The construction plan <br /> shall identify a procedure for <br /> coordination with nearby noise- <br /> sensitive facilities so that <br /> construction activities and the <br /> event schedule can be scheduled <br /> to minimize noise disturbance. <br /> This plan shall be provided to all <br /> noise-sensitive land uses within <br /> 500 feet of the construciion site. <br /> • Construction Scheduling. <br /> Ensure that noise-generating <br /> construction aclivity is limited to <br /> between the hours of 7:00 AM to <br /> 8:00 PM Monday through Friday. <br /> (Redwood City Municipal Code <br /> Section 24.30) <br /> ■ Construcfion Equipment Mufflers <br /> and Maintenance. Equip all <br /> internal combustion engine-driven <br /> equipment with intake and <br /> exhaust mufflers that are in good <br /> condition and appropriate for the <br /> equipment. <br /> • Equipment Locations. Locate <br /> stationary noise-generating <br /> equipment required on <br /> construction project sites as far <br /> as possible from sensitive <br /> receptors when sensikive <br /> receptors adjoin or are near a <br /> construction pro'ect site. <br /> .. <br /> Page 35 C:Ibocuroents and Settingsltpassanisi{LocaJ SeftingslTemporary h�ternet Files10LK491mmcht (10671).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.