My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE implementation Monitoring and Timing Signature Date <br /> Performance Crikeria Entit Verifcation Entit Re uirements <br /> ■ Construction Traffic. Route all <br /> construction tra�c to and from <br /> the construction sites via <br /> designated truck routes to the <br /> maximum extent feasible. <br /> Prohibii construction-related <br /> heavy truck traffic in residential <br /> areas where feasible. <br /> ■ Qirret Equipment Selection. Use <br /> quiet construction equipment, <br /> particularly air compressors, <br /> wherever feasible. <br /> • Temporary 8arriers. Construct <br /> solid plywood fences around <br /> construction sites adjacent to <br /> residences, operational <br /> businesses, or noise-sensitive <br /> land uses. <br /> • Temporary Noise Bfankets. <br /> Temporary noise control blanket <br /> barriers should be erected along <br /> building facades af construction <br /> sites to atienuate noise from <br /> elevated activities if noise <br /> conflicts cannot be resolved by <br /> scheduling. (Noise control <br /> blanket barriers can be rented <br /> and quickly erected.) <br /> • Noise Disturbance Coordinafor. <br /> For projects that would last over <br /> one year in duration, the City may <br /> choose to require project <br /> designation of a "Noise <br /> Disturbance Coordinator" who <br /> would be responsible tor <br /> responding to any local <br /> compiaints about construction <br /> noise. The Disturbance <br /> Coordinalor would determine the <br /> cause of the noise com laini <br /> � <br /> C7 <br /> Page 36 C:IDocuments and SettingsltpassanisrlLoca! SettingslTempararylnfeme( Filesl0tK491mmcM (10671).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.