My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br /> tDENTIFIED IMPACT RELATED MITIGATION MEASURE Impiementation Monitoring and Timing Signature Date <br /> Performance Criteria Entit Verification Entit Re uirements <br /> Water Quality Control Board <br /> (RWQCB). All project design <br /> modifications and mitigation measures <br /> required by the ACE, CDFG and <br /> RWQCB sha{I be incorporated into the <br /> project prior to project approval. <br /> Implementation of this measure would <br /> ensure thaf potential impacts on <br /> wetland resaurces a�e minimized and <br /> adequate replacement is provided, <br /> mitigating this potential impact to a <br /> less-than-si nificant level. <br /> Impact 15-3: Wildlife Movement and Mitigation 15-3: All tree removal and Individual project City; CDFG Condition of <br /> Migratory Wildlife Impacts. Grading trimming, as well as ground disturbing applicants grading permit <br /> and construction activities associated activities, shall be scheduled to take issuance; field <br /> with development under the DPP could place outside of the breeding season verify <br /> impact nesting birds. This possibility (February 15 to August 31). If implementation <br /> represents a potentially s�gnificant construction is unavoidable during this during grading and <br /> impact. time, a qualified biologist shall construction. <br /> conduct a survey For nesting birds no <br /> more than three days prior to the <br /> removal or trimming of any tree and <br /> prior to ihe start of ground disturbing <br /> activities. If active nests are not <br /> present, project activities can proceed <br /> as scheduled. If active nests of <br /> protected species are detected, a <br /> buffer will be established around the <br /> nest based on consultation with CDFG <br /> and based on CDFG standards, which <br /> buffer shall remain in place until the <br /> City has determined, in consultation <br /> with a qualified biologist, that the <br /> buffer is no longer necessary to avoid <br /> significant impacts to the nest. This <br /> measure would reduce the poteniial <br /> impacts of the DPP related to <br /> migratory wildlife to a less-than- <br /> si nificant level. <br /> fmpact 15-4: Potential Loss of Mitigation 15-4. Any project in the Individual project Gity During individual <br /> Heritage Trees. Future development in DPP area that w�uld involve the applicants project review: <br /> accordance with the DPP may resull in removal of any tree shall complete the condition of <br /> the removal of heritage trees as defined application and review process grading permit <br /> .. <br /> Page 42 C:IDocuments and Setfingsl[passanisilLocal SettingslTemporary Infernet Fi1es10LK491mmcht (10671).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.