Laserfiche WebLink
MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Impiementation Monitoring and Timing Signature Date <br /> Performance Criteria Entit Verification Entit Re uiremenls <br /> by the City's Tree Preservation specified in the City's Tree issuance; fieid <br /> Ordinance (Municipal Code chapter 35). Preservation Ordinance (Municipal verify <br /> This possibility represents a potentia!ly Code chapter 35) prior to project implementation <br /> significant impact. approval. Implemeniation of this during grading and <br /> measure would ensure protection of construction. <br /> heritage trees, as well as planting of <br /> replacement trees in cases where <br /> trees are removed, thereby mitigaling <br /> potential impacts to a /ess-than- <br /> si nificant level. <br /> GEOLOGYAND SO/LS <br /> Impact 16-1: Expansive Soils Mitigation 16-1. The detailed, individual project Cify During individual <br /> Impacts. The proposed DPP would design-level geotechnical applicants project review; <br /> allow development in areas that may be investigations required by the City condition of <br /> subject to hazards from expansive soils, Building Official shall include analysis grading permit <br /> representing a potentia!!y significant of expansive soil hazards and issuance; field <br /> impact. recommend stabilization measures. verify <br /> Once grading plans have been implemenlation <br /> developed, the actual use of during grading and <br /> expansive soifs in engineered fill construction. <br /> construction shall be further evaluated <br /> and the location of primary borrow <br /> source areas for fills shall be <br /> determined. Additionally, <br /> supplemental field and laboratory <br /> testing of potential cut materials shall <br /> be completed. In addilion to <br /> observing all cui and fill slope <br /> construction, the project geotechnical <br /> engineer shall inspect and certify that <br /> any expansive soils underlying <br /> individual building pads and all <br /> roadway subgrades have been either <br /> removed or amended in accordance <br /> with City-approved construction <br /> specifications. If expansive soils are <br /> not fully remediated on each lot and in <br /> the area of all public and private <br /> improvements at the time of site <br /> development, the project geotechnical <br /> engineer shall make site-specific <br /> recommendations for grading, <br /> drainage instaâ–ºlation, foundation <br /> desi n, the addition of soil <br /> .. <br /> Page 43 C:IDocuments and SettingsltpassanisilLocal SeftingslTempaary Inlernet Files10LK491mmcht (10671 J.doc <br />