My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Impiementation Monitoring and Timing Signature Date <br /> Performance Criteria Entit Verification Entit Re uiremenls <br /> by the City's Tree Preservation specified in the City's Tree issuance; fieid <br /> Ordinance (Municipal Code chapter 35). Preservation Ordinance (Municipal verify <br /> This possibility represents a potentia!ly Code chapter 35) prior to project implementation <br /> significant impact. approval. Implemeniation of this during grading and <br /> measure would ensure protection of construction. <br /> heritage trees, as well as planting of <br /> replacement trees in cases where <br /> trees are removed, thereby mitigaling <br /> potential impacts to a /ess-than- <br /> si nificant level. <br /> GEOLOGYAND SO/LS <br /> Impact 16-1: Expansive Soils Mitigation 16-1. The detailed, individual project Cify During individual <br /> Impacts. The proposed DPP would design-level geotechnical applicants project review; <br /> allow development in areas that may be investigations required by the City condition of <br /> subject to hazards from expansive soils, Building Official shall include analysis grading permit <br /> representing a potentia!!y significant of expansive soil hazards and issuance; field <br /> impact. recommend stabilization measures. verify <br /> Once grading plans have been implemenlation <br /> developed, the actual use of during grading and <br /> expansive soifs in engineered fill construction. <br /> construction shall be further evaluated <br /> and the location of primary borrow <br /> source areas for fills shall be <br /> determined. Additionally, <br /> supplemental field and laboratory <br /> testing of potential cut materials shall <br /> be completed. In addilion to <br /> observing all cui and fill slope <br /> construction, the project geotechnical <br /> engineer shall inspect and certify that <br /> any expansive soils underlying <br /> individual building pads and all <br /> roadway subgrades have been either <br /> removed or amended in accordance <br /> with City-approved construction <br /> specifications. If expansive soils are <br /> not fully remediated on each lot and in <br /> the area of all public and private <br /> improvements at the time of site <br /> development, the project geotechnical <br /> engineer shall make site-specific <br /> recommendations for grading, <br /> drainage instaâ–ºlation, foundation <br /> desi n, the addition of soil <br /> .. <br /> Page 43 C:IDocuments and SettingsltpassanisilLocal SeftingslTempaary Inlernet Files10LK491mmcht (10671 J.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.