Laserfiche WebLink
8. C '� <br /> ExhiQ� 86 <br /> achieved by Mitigation Measure 9-5 (page 9-51 of the DEIR) with the addition of <br /> a second northbound right turn lane on Broadway. While the LOS F would still <br /> exceed the City LOS standard, the delay under Project Conditions would be less <br /> than under Background Conditions. However, the improvements proposed by <br /> Mitigation Measure 9-5 are within the Woodside Road (SR 84) right-of-way and <br /> therefore within the responsibility and jurisdiction of Caltrans. While the City <br /> believes these improvements can and should be adopted by Caltrans, because their <br /> implementation is outside of the City's jurisdiction, they are deemed infeasible <br /> and this impact is considered significant and unavoidable. <br /> (u) Remaining Impacts. Because there are no feasible mitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> {iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP override the significant adverse impacts <br /> of the DPP relating to increased traffic described above, as set forth in the <br /> Statement of Overriding Considerations below. <br /> Impact 9-6: Project Impact on Veterans Boulevard/Whipple Avenue <br /> Intersection. Under both Background Conditions and Project Conditions during the <br /> PM peak hour, this intersection would operate at unacceptable LOS E. The <br /> additional project traffic would cause the critical delay to increase by more than five <br /> (5) seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9-38 to 9-48 of the DEIR. <br /> b) Mitigation Measures. FEIR Mitigation Measure 9-6 (p. 9-51 <br /> of the DEIR) is hereby adopted and will be implemented as provided in the Mitigation <br /> Monitoring and Reporting Program. <br /> c) Findings. Based on the FEIR and the entire record before the City, <br /> the City Council finds that Mitigation Measure 9-6 will reduce this impact from <br /> additional traffic evacuation to a less than significant level because restriping the lane <br /> will improve intersection operation to an acceptable LOS. <br /> Impact 9-7: Project Impact on Veterans Boulevard/Woodside Road <br /> Intersection. Under both Background Conditions and Project Conditions during the <br /> PM peak hour, this intersection would operate at unacceptable LOS E. The <br /> additional project traffic would cause the critical delay to increase by more than five <br /> (5) seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9-38 to 9-48 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> S:UtESOLUTIONS\Reso. 209� CEQA Findings for DPP Exhibit B.doc Z(� <br /> 012011 <br />