Laserfiche WebLink
8.0 <br /> Exhi�� $$ <br /> outside of the City's jurisdiction, therefore it is deemed infeasible and this impact i <br /> is considered significant and unavoidable. I <br /> (ii) Remaining Impacts. Because there are no feasible mitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP ovemde the significant adverse impacts <br /> of the DPP relating to increased traffic described above, as set forth in the <br /> Statement of Overriding Considerations below. <br /> Impact 9-9: Impacts on Transit Service. Build-out of the DPP would <br /> generate an estimated additional 106 AM peak hour transit trips and 147 PM peak <br /> hour transit trips, which would place additional demand on existing Caltrain, <br /> Samtrans, and shuttle service, as well as the streetcar proposed in the Draft New <br /> General Plan and the proposed future High Speed Rail service. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 9-56 to 9-57 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigation Measures. Mitigation of this project impact could be <br /> achieved by Mitigation Measure 9-9 (p. 9-57 of the DEIR) which requires that the <br /> City coordinate with Samtrans, Caltrain, and the High Speed Rail Authority to <br /> facilitate expanded transit services to the DPP area in pace with DPP-related <br /> increases in transit demand. However, given the long-term build-out of the DPP <br /> and the uncertainty of the existing and proposed transit facilities, equipment and <br /> services in the future, it cannot be determined at this time whether service <br /> enhancements would be implemented concurrently with increased demand such <br /> that acceptable service levels would be maintained. Therefore, the impacts of the <br /> DPP on transit service are currently deemed to be significant and unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible znitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP override the significant adverse irnpacts <br /> of the DPP relating to increased demand on transit services described above, as <br /> set forth in the Statement of Overriding Considerations below. <br /> S:\RESOLU'('IONS\Reso. 2092 CEQ.4 Findings for DPP l3xhibit B.doc zS <br /> 012011 <br />