My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-01-24
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-01-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2012 12:57:48 PM
Creation date
1/20/2011 5:18:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
1/24/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.0 <br /> ExhiB�� 89 <br /> Impact 9-10: Cumulative Impact on EI Camino ReaUWhipple Avenue <br /> Intersection. Under Cumulative With Project Conditions during the PM peak hour, <br /> this intersection would continue to operate at an unacceptable LOS F. The <br /> additional project traffic would cause the average delay to increase by more than � <br /> five (5) seconds. � <br /> a) Potentia! Impact. The impact identified above is described and discussed <br /> on pages 9-5$ to 9-64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigatian Measures. Mitigation of this project impact could be <br /> achieved by Mitigation Measure 9-1 as discussed under Impact 9-1, above. As <br /> discussed under Impact 9-1 above, however, any improvements within the El <br /> Camino Real right-of-way are within the responsibility and jurisdiction of <br /> Caltrans. While the City believes this mitigation measure can and should be <br /> adopted by Caltrans, because its implementation is outside of the City's <br /> jurisdiction, it is deemed infeasible and this impact is cQnsidered to be significant <br /> and unavoidable. <br /> (ii) Remaining Impacts. Because there are no feasible mitigation <br /> measures available to mitigate the significant impact identified above, this impact <br /> is considered significant and unavoidable. <br /> (iii) Overriding Considerations. The environmental, social, <br /> economic and other benefits of the DPP override the significant adverse impacts <br /> of the DPP relating to the cumulative traffic impacts described above, as set forth <br /> in the Statement of Overriding Considerations below. <br /> Impact 9-I1: Cumulative Impact on EI Camino ReallJefferson Avenue <br /> Intersection. Under Cumulative With Project Conditions during both the AM and <br /> PM peak hour, this intersection would continue to operate at an unacceptable LOS <br /> (E or F). The additional project traffic would cause the critical delay to increase by <br /> more than five (5) seconds. <br /> a) Potential Impact. The impact identified above is described and discussed <br /> on pages 4-58 to 9-64 of the DEIR. <br /> b) Findings. Based on the FEIR and the entire record before the City, the <br /> City Council finds that: <br /> (i) Mitigatian Measures. Mitigation of this project impact could <br /> be achieved by Mitigation Measure 9-2 as discussed under Impact 9-2, above. <br /> However, any improvements within the EI Camino Real right-of-way are within <br /> the responsibility and jurisdiction of Caltrans, and not within the jurisdiction or <br /> authority of the City. In addition, these improvements would conflict with newly <br /> adopted PED policies contained in the City's New General Plan. PED policies <br /> 5:1RES01_UTIONS\kcso. 2092 CEQA Findings for DPP Exhibit $.doc 29 <br /> D12011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.